Federal Contracting Acronym
INDIRECT RATE
Research this with AI
Research smarter with AI
Analyze opportunities and compare insights across leading AI models.
Indirect Cost Rate
Plain-English definition
Contractors develop indirect rates to recover fringe, overhead, and G&A costs that cannot be traced directly to a contract line item. FAR 31.203 requires allocations that produce equitable results in line with the benefits received. Forward pricing uses provisional or proposed rates; billing often uses provisional rates subject to final determination after audit. Negotiated rate agreements with DCMA or agency cognizant auditors provide stability across awards. When actual costs differ from provisional rates, FAR 42.705 incurred cost submissions drive retroactive adjustments. On cost-reimbursement contracts, unallowable costs must be excluded from rate pools under FAR 31.201-6. Proposal teams should show the buildup from trial balance to pool, base, and rate, and should tie labor categories to the same structure used in the accounting system.
Why it matters
A one-point error in the overhead rate can shift hundreds of thousands of dollars on a labor-heavy contract.
Where you'll encounter it
Rate proposal submissions, billing instructions, cost volumes, and DCAA floorchecks.
Example
The pricer applies the negotiated FY overhead rate to direct labor on the cost-reimbursement CLIN while flagging ODCs that bill at cost without indirect loading.
Related acronyms
Authoritative source
Stored reference. A section-level source fact has not been verified for this term.