Federal Awards · THE REGENTS OF THE UNIVERSITY OF COLORADO · Award

THIS WORK TO BE PERFORMED BY THE UNIVERSITY OF COLORADO LABORATORY FOR ATMOSPHERIC AND SPACE PHYSICS (LASP)…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
80GSFC18C0005
Contractor
THE REGENTS OF THE UNIVERSITY OF COLORADO
Sub-agency / office
National Aeronautics and Space Administration
Award amount
$40,000
Period of performance
May 29, 2018 – Feb 28, 2019
NAICS
541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSC
PSC AR22

Public award description

THIS WORK TO BE PERFORMED BY THE UNIVERSITY OF COLORADO LABORATORY FOR ATMOSPHERIC AND SPACE PHYSICS (LASP) IN SUPPORT OF THE FOXSI PHASE A AND BRIDGE PHASE B (IF AUTHORIZED) CONCEPT DEFINITION PORTION OF THE 2016 SMALL EXPLORER ANNOUNCEMENT OF OPPORTUNITY #NNH16ZDA005O. THE LASP SHALL PROVIDE ALL NECESSARY RESOURCES AND SKILLS TO PERFORM AND MANAGE THE TASKS DEFINED IN THIS SOW RELATED TO THE FOXSI INSTRUMENT SOLAR POSITION SENSOR (SPS). ALL DOCUMENTATION MAY BE IN LASP FORMAT. ALL DELIVERIES ARE ELECTRONIC. THE LASP SHALL PROVIDE INPUTS AS NEEDED TO THE FOXSI PROJECT IMPLEMENTATION PLAN AND OTHER PROGRAMMATIC DOCUMENTS. THE LASP SHALL GENERATE INPUTS TO THE FOXSI SYSTEM ENGINEERING MANAGEMENT PLAN, THE FOXSI SYSTEM VERIFICATION AND VALIDATION PLAN, AND TO ALL ICD'S BETWEEN THE LASP SPS AND OTHER MAJOR INSTRUMENT ELEMENTS, AS NEEDED. THE LASP SHALL PERFORM OR PROVIDE INPUT TO THE TRADES AND STUDIES, AS NEEDED, DESCRIBED IN THE PHASE A PROPOSAL AND SHALL PERFORM OTHER TRADES NECESSARY TO DERIVE AN SPS THAT MEETS MISSION AND INSTRUMENT REQUIREMENTS. LASP WILL DO A TRADE STUDY ON THE SPS DESIGN OPTIONS INVOLVING THE MODIFICATIONS TO THE GOES-R EXIS SPS AND TSIS-1 SPS TO MEET THE FOXSI SPS REQUIREMENTS. LASP AND GSFC WILL JOINTLY DO A TRADE STUDY ON THE OPTION FOR ONE OR TWO SPS FLIGHT UNITS IN REGARD TO OPTIMIZING MISSION OPERATIONS. THE LASP SHALL UPDATE THE SPS DESIGNS TO MEET MISSION AND INSTRUMENT LEVEL REQUIREMENTS AS NECESSARY. THE LASP SHALL REVIEW AND REFINE THE SPS BUDGETS INCLUDING MASS, POWER, AND OTHER MARGINS REQUIRED FOR PHASE A. THE LASP SHALL UPDATE THE SPS MEL AS NEEDED. THE LASP SHALL PARTICIPATE IN THE FOXSI RISK PROCESS. THIS ACTIVITY SHALL INCLUDE THE ASSESSMENT OF THE SPS COMPONENTS TRL LEVELS AND THE ASSESSMENT OR GENERATION OF PLANS TO BRING ANY NEW OR MODIFIED EQUIPMENT TO AN ADEQUATE STATE OF DEVELOPMENT IF REQUIRED. THIS PROCESS SHALL INCLUDE ASSESSING ANY TECHNICAL WEAKNESSES IDENTIFIED IN THE SELECTION DEBRIEF AND GENERATING CORRECTIVE ACTIONS.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.