THIS IS WORK IS FOR THE DETAILED DESIGN AND FABRICATION OF AN ADVANCED ROTORCRAFT TESTBED SUITABLE FOR TEST…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- 80LARC19F0072
- Contractor
- Awarding agency
- National Aeronautics and Space Administration
- Sub-agency / office
- National Aeronautics and Space Administration
- Award amount
- $2,329,159
- Period of performance
- Sep 26, 2019 – Oct 30, 2019
- NAICS
- 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- PSC
- PSC AR11
- Place of performance
- VA
- Parent award
- 80LARC18D0005
Public award description
THIS IS WORK IS FOR THE DETAILED DESIGN AND FABRICATION OF AN ADVANCED ROTORCRAFT TESTBED SUITABLE FOR TESTING A VARIETY OF WINGED COMPOUND ROTORCRAFT CONFIGURATIONS IN THE 14- BY 22-FOOT SUBSONIC TUNNEL BY WAY OF A TRAVERSING ASSEMBLY MOUNTED BELOW A NEW FALSE FLOOR MOUNTED ON ONE OF THE FACILITY'S MODEL CARTS. IN THIS PROJECT, A WINGED COMPOUND HELICOPTER IS DEFINED AS AN AIRCRAFT WITH A CONVENTIONAL ROTOR, LIFTING WINGS, AND CONVENTIONAL TAIL SURFACES. THE ULTIMATE PURPOSE OF THIS TEST EFFORT IS TO GAIN AN UNDERSTANDING OF THE DIFFERENT CONFIGURATION EFFECTS ON THE PERFORMANCE OF COMPOUND ROTORCRAFT TO DRIVE FUTURE ARMY DESIGNS, AND AS SUCH, THE DESIGN SHALL INCORPORATE THE ABILITY TO MEASURE THE INTERACTIONAL EFFECTS OF THE ROTOR WAKE ON THE WING LOCATED AT VARIOUS LOCATIONS, AS WELL AS DIFFERENT TAIL CONFIGURATIONS AND TAIL PROPULSOR CONFIGURATIONS. TESTING WILL INCLUDE THE MEASUREMENT OF ROTOR AND WING LOADS AND MOMENTS AS WELL AS STATIC AND DYNAMIC PRESSURE DATA AT A NUMBER OF LOCATIONS AROUND THE MODEL. THIS TEST CAMPAIGN WILL COVER TWO ENTRIES IN THE 14X22, TENTATIVELY SCHEDULED FOR SUMMER 2019 AND LATE SUMMER/EARLY FALL 2020, AND WILL BE CLOSELY COUPLED WITH A COMPUTATIONAL VALIDATION EFFORT. WHILE THIS SOW IS SPECIFICALLY FOR THE HARDWARE FOR THE FIRST ENTRY, IT IS ANTICIPATED THAT THE MAJORITY OF THE HARDWARE WILL BE UTILIZED FOR THE SECOND ENTRY AS WELL. APPROXIMATELY 95% OF THE DESIGN WORK AND 20% OF THE FABRICATION WAS COMPLETED UNDER RECOM IV. THIS SOW OUTLINES THE TASKS REQUIRED TO COMPLETE THE DESIGN AND FABRICATION UNDER RECOM V.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.