Federal Awards · VISSIDUS TECHNOLOGIES INC · Award

THE GOAL OF THE PROPOSED PHASE I WORK IS TO DEMONSTRATE THE FEASIBILITY OF THE COORDINATION AND CONTROL OF…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
80NSSC18P2136
Contractor
VISSIDUS TECHNOLOGIES INC
Sub-agency / office
National Aeronautics and Space Administration
Award amount
$124,710
Period of performance
Jul 27, 2018 – Aug 26, 2019
NAICS
541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSC
PSC AR11

Public award description

THE GOAL OF THE PROPOSED PHASE I WORK IS TO DEMONSTRATE THE FEASIBILITY OF THE COORDINATION AND CONTROL OF A LOW CARDINALITY (N=12) SWARM OF SMALLSATS THAT REALIZES A DISTRIBUTED SYNTHETIC APERTURE RADAR (SAR) IN LOW EARTH ORBIT. PRELIMINARY MISSION AND SPACECRAFT DESIGN WORK HAS SHOWN THAT THE SWARM CAN SUPPORT SAR IMAGING IN THE L-BAND (1.35 GHZ) WITH A GROUND RANGE RESOLUTION FINER THAN 10 M WITH A REVISIT PERIOD OF EIGHT DAYS. THE SPACECRAFT IN THE SWARM ARE PRE-PROGRAMMED TO RENDEZVOUS IN A REGION, SAY A SPHERE OR BOX OF CERTAIN DIMENSIONS, CENTERED AT A SPECIFIED SET OF (ABSOLUTE) ORBITAL ELEMENTS. AFTER DEPLOYMENT FROM THE LAUNCHER EACH SATELLITE MANEUVERS TO BRING ITSELF INTO THE RENDEZVOUS SPHERE WHILE MONITORING ITS SURROUNDINGS WITH ON-BOARD MEANS, SUCH AS THE STAR TRACKER CAPABLE OF TAKING STILL IMAGES WHILE ATTEMPTING TO CLOSE INTER-SPACECRAFT RADIO COMMUNICATIONS (ISRC) LINKS WITH ITS NEIGHBORS. BOTH (PASSIVE) OPTICAL OR ISRC-BASED RELATIVE NAVIGATION ARE THEN USED TO DETERMINE THE RELATIVE POSITION AND VELOCITY VECTORS BETWEEN SPACECRAFT WHILE THEY MANEUVER TO AGGREGATE THE SWARM IN ITS NOMINAL OPERATIONS CONFIGURATION. DURING SWARM AGGREGATION AND NOMINAL OPERATIONS, ALGORITHMS DEVELOPED IN THE FRAMEWORK OF EVOLVING SYSTEMS ENSURE THE STABILITY OF THE SWARM. FAILURE OF ONE SWARM MEMBER WILL ALSO BE SIMULATED TO ANALYZE THE SWARM RECONFIGURATION AND RECOVERY OF NOMINAL OPERATIONS AFTER RECONFIGURATION. FORMAL PROOFS OF FEEDBACK CONTROL SYSTEM PROPERTIES SUCH AS CONTROLLABILITY-OBSERVABILITY, STABILITY, DETECTABILILTY, AND ROBUSTNESS WILL BE PURSUED TO ESTABLISH A SOLID THEORETICAL FOUNDATION FOR THE PROPOSED ALGORITHMS. THE PHASE I FEASIBILITY DEMONSTRATION WILL MEET MOST OF THE TECHNICAL OBJECTIVES IDENTIFIED IN THE SOLICITATION FOR THE CORRESPONDING MODES OF SWARM OPERATIONS.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.