Federal Awards · BUSEK CO., INC. · Award

THE COMPACT HIGH PERFORMANCE PLASMA PROPULSION SYSTEM (CHPPPS) IS AN ELECTRIC PROPULSION SYSTEM FOR 12U 27U…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
80NSSC18P2215
Contractor
BUSEK CO., INC.
Sub-agency / office
National Aeronautics and Space Administration
Award amount
$124,899
Period of performance
Jul 27, 2018 – Jan 25, 2019
NAICS
541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSC
PSC AR11

Public award description

THE COMPACT HIGH PERFORMANCE PLASMA PROPULSION SYSTEM (CHPPPS) IS AN ELECTRIC PROPULSION SYSTEM FOR 12U 27U CUBESATS. CHPPS IS DESIGNED FOR HIGH-VALUE SCIENCE MISSIONS WHICH REQUIRE HIGH SPECIFIC IMPULSE, HIGH RELIABILITY, AND RADIATION TOLERANCE. CHPPPS INCLUDES A LOW POWER HALL EFFECT THRUSTER (HET), A HOLLOW CATHODE FOR NEUTRALIZING THE ION BEAM, A PROPELLANT MANAGEMENT SYSTEM, AND A POWER PROCESSING UNIT (PPU). THE SYSTEM IS HIGHLY MODULAR AND APPROPRIATE FOR 12U 27 U CUBESATS IN TERMS OF SIZE, MASS, AND POWER. CHPPPS MAY BE AS SMALL AS 4U, DEPENDING UPON THE FUEL LOAD AND SPECIFIC COMPONENT SELECTION. THRUST WILL BE 3-8 MN, DEPENDING ON THE POWER SUPPLIED (60 135 W) AND PEAK SPECIFIC IMPULSE WILL BE>1100 S. THE THRUSTER WILL BE FUELED WITH XENON OR WITH GAME-CHANGING IODINE, WHICH STORES AS A SOLID AT VERY LOW PRESSURE AND MUCH HIGHER DENSITY THAN XENON. THE USE OF IODINE SIGNIFICANTLY DECREASES SPACECRAFT DRY MASS, AND DRAMATICALLY DECREASES PROPELLANT VOLUME. THE IMPACT OF SWITCHING FROM XENON TO IODINE IS MOST SIGNIFICANT FOR VOLUME LIMITED SPACECRAFT LIKE CUBESATS. WHETHER THE THRUSTER IS FUELED BY XENON OR BY IODINE, THE ION BEAM WILL BE NEUTRALIZED BY A HOLLOW CATHODE FLOWING NOBLE GAS. THE THRUSTER WILL BE POWERED BY A COMPACT, RADIATION TOLERANT POWER PROCESSING UNIT (PPU) PREVIOUSLY DEVELOPED FOR NASA AND AIR FORCE APPLICATIONS. ACS MAY BE PROVIDED BY COLD GAS THRUSTERS FED FROM THE NOBLE GAS STORAGE SYSTEM. IN PHASE I, THE SYSTEM DESIGN WILL BE DETAILED AND STUDIED. WORK WILL INCLUDE A PROOF OF CONCEPT HARDWARE DEMONSTRATION AT RELEVANT POWER LEVELS.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.