Federal Awards · Award

OF INTEREST TO JPL, GRC AND GSFC ARE LASER COMMUNICATIONS TELESCOPES (LCTS) WITH 30 TO 100 CM CLEAR APERTUR…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
80NSSC19C0138
Contractor
Sub-agency / office
National Aeronautics and Space Administration
Award amount
$709,436
Period of performance
Jul 22, 2019 – Jun 26, 2021
NAICS
541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSC
PSC AR11
Place of performance
NM

Public award description

OF INTEREST TO JPL, GRC AND GSFC ARE LASER COMMUNICATIONS TELESCOPES (LCTS) WITH 30 TO 100 CM CLEAR APERTURE, WAVEFRONT ERROR (WFE) LESS THAN 62 NM, CUMULATIVE WFE AND TRANSMISSION LOSS NOT TO EXCEED 3-DB IN THE FAR FIELD, ADVANCED THERMAL AND STRAY LIGHT DESIGN FOR OPERATION WHILE SUN-POINTING (3-DEGREES FROM THE EDGE OF THE SUN); -20 C TO 50 C OPERATIONAL RANGE (WIDER RANGE PREFERRED), AND AREAL DENSITY<65KG/M2. TELESCOPE DIMENSIONAL STABILITY, LOW SCATTER, EXTREME LIGHTWEIGHTING, AND PRECISION STRUCTURES ARE A COMMON THEME ACROSS THE NASA 2017 PHYSICS OF THE COSMOS AND COSMIC ORIGINS PROGRAM ANNUAL TECHNOLOGY REPORT. MULTIPLE PRIORITY TIER 1-4 TECHNOLOGY GAPS CAN BE FOUND, AND THE HIGHER PRIORITIES REQUIRE A SOLUTION IN TIME FOR THE NEXT DECADAL SURVEY. A COMMON SOLUTION OF INTEREST THAT HAS BEEN CITED IS SILICON CARBIDE AND 3D PRINTING OR ADDITIVE MANUFACTURING. ROBOSIC TECHNOLOGIES PROVIDE BOTH. GT PROPOSES TO DESIGN, 3D PRINT AND ADDITIVELY MANUFACTURE A PROTOTYPE GREGORIAN LCT USING THE PATENT PENDING ROBOSIC-S TECHNOLOGY DEMONSTRATED IN PHASE I, INCLUDING BOLTS, TRUSS STRUCTURES, MIRROR MOUNTS. OFF-AXIS MIRRORS WILL BE PRINTED. ROBOSIC-S PROVIDES THE DEGREE OF PASSIVE ATHERMALITY REQUIRED FOR THE LCT OPTICAL PATHLENGTH AND WAVEFRONT ERROR STABILITY, CONCOMITANT WITH LOW AREAL DENSITY MIRRORS (7.75-10 KG/M2) AND STRUCTURES (4-5 KG/M2), AND A THEORTICAL FIRST UNIT COST FOR AN LCT WITH A FAST STEERING MIRROR IS $1.5M, A FACTOR OF 3-4 LESS THAN CURRENT LCTS. A PHASE IIE PROJECT IS PLANNED WHICH WILL INTEGRATE 3D PRINTED ROBOSIC MIRRORS INTO THE TELESCOPE AND PERFORM ENVIRONMNETAL AND OTHER TESTS TO RAISE THE TRL TO 6 FOR COMMERCIAL SALES.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.