IGF::OT::IGF 70KW UPS (SCALABLE TO 100KW), 208V (STARTUP INCLUDED) UPS MANAGEMENT SOFTWARE SERVER RACKS AND…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- EP147000181
- Contractor
- Awarding agency
- Environmental Protection Agency
- Sub-agency / office
- Environmental Protection Agency
- Award amount
- $0
- Period of performance
- Sep 30, 2014 – Feb 15, 2015
- NAICS
- 238210 — Electrical Contractors and Other Wiring Installation Contractors
- PSC
- PSC D302
- Place of performance
- WA
Public award description
IGF::OT::IGF 70KW UPS (SCALABLE TO 100KW), 208V (STARTUP INCLUDED) UPS MANAGEMENT SOFTWARE SERVER RACKS AND RELATED EQUIPMENTS (PDU, CABLE MANAGEMENT, VENTING) COLD AISLE CONTAINMENT SYSTEM FOR SERVER ENCLOSURES SECURITY CAMERAS AND RELATED HARDWARE AND SOFTWARE INSTALLATION, STARTUP, AND TRAINING INCLUDED. FREIGHT WILL BE INCLUDED THE CONTRACTOR SHALL PROVIDE AND INSTALL THE REQUIRED MATERIAL TO COMPLETE THIS PROJECT, WHICH MAY INCLUDE DETAILED ACTIVITIES THAT HAVE NOT BEEN SPECIFICALLY IDENTIFIED. THE WORK SHALL INCLUDE, THOUGH NOT BE LIMITED TO, THE FOLLOWING: 1. FURNISH AND INSTALL A COMPLETE 70KW UPS (SCALABLE TO 100KW), 208V 2. FURNISH AND INSTALL (12) 42U 750MM WIDE X 1200MM DEEP ENCLOSURES (RACKS) 3. FURNISH AND INSTALL HARDWARE NECESSARY TO COMPLETE RACK EQUIPMENT INSTALLATION 4. FURNISH, INSTALL AND LABEL ALL REQUIRED RACKS PER PROVIDED GUIDELINES. 5. PROVIDE WIRING MANAGEMENT ON EACH RACK AND BETWEEN EACH RACK PER PROVIDED GUIDELINES 6. ADHERE AND COMPLY WITH ALL REQUIREMENTS OF MANUFACTURERS WARRANTY PROGRAM. 7. THE CONTRACTOR MUST COORDINATE INSTALLATION SCHEDULE WITH THE EPA CONTRACTING OFFICER REPRESENTATIVE (COR). 8. DURING INSTALLATION, THE CONTRACTOR MUST PROTECT THE WORK AREAS FROM DEBRIS AND DAMAGE FROM INSTALLATION ACTIVITIES
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.