REMOVE EXISTING CEILING TILES, SUPPLY AND INSTALL NEW TILES. SCOPE OF WORK 1. PROTECT HORIZONTAL SURFACES,…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- GS02P10PHP0091
- Contractor
- Awarding agency
- General Services Administration
- Sub-agency / office
- Public Buildings Service
- Award amount
- $0
- Period of performance
- Jun 25, 2010 – Dec 25, 2010
- NAICS
- 238990 — All Other Specialty Trade Contractors
- PSC
- PSC Z111
- Place of performance
- NY
Public award description
REMOVE EXISTING CEILING TILES, SUPPLY AND INSTALL NEW TILES. SCOPE OF WORK 1. PROTECT HORIZONTAL SURFACES, SUPPLIES AND EQUIPMENT IN THE KITCHEN AREA FROM DUST, DEBRIS AND DAMAGE DURING THE CEILING TILE REPLACEMENT. 2. REMOVE APPX 400 EXISTING CEILING PANELS 3. SUPPLY AND INSTALL APPX 400 TILES SHAPED AND SIZED TO FIT THE EXISTING GRID. THE PANELS/ CEILING TILES MUST BE RATED AS ANTIMICROBIAL AND MOLD RESISTANT. WHITE OR A LIGHT SHADE ARE THE PREFERABLE COLOR. 4. THE CEILING TILES MUST FIT INTO THE EXISTING GRID SO THAT THE RESULTING APPEARANCE IS UNIFORM, SMOOTH AND ESTHETICALLY PLEASING. 5. STRICTLY ADHERE TO US DEPT OF LABOR, OSHA REGULATIONS CONCERNING WORKER SAFETY AND PROTECTION INCLUDING BUT NOT LIMITED TO PERSONAL PROTECTIVE EQUIPMENT, LADDERS AND SCAFFOLDING AND WALKING/ WORKING SURFACES. 6. ALL MATERIALS AND SUPPLIES MUST BE OF COMMERCIAL GRADE AND APPROVED BY GSA OR A GSA REPRESENTATIVE PRIOR TO INSTALLATION. 7. ALL WORK WILL BE PERFORMED IN A PROFESSIONAL, WORKMAN- LIKE MANNER. GSA RESERVES THE DO REJECT UNPROFESSIONAL FINISHES AND REQUIRE THAT THE CONTRACTOR REMEDY THE DEFECTS AT THE CONTRACTOR'S EXPENSE. 8. ALL DEBRIS, EQUIPMENT AND EXCESS MATERIALS WILL BE REMOVED FROM THE AREA. PROTECTIVE COVERINGS MUST BE REMOVED AND ANY SUPPLIES OR EQUIPMENT MOVED BY THE CONTRACTOR MUST BE REPLACED. 9. INSIDE AND OUTSIDE THE BUILDING WILL BE LEFT IN A CLEAN, SAFE CONDITION B. WORK MUST BE PERFORMED DURING NON- BUSINESS HOURS OF THE BUILDING. THE CONTRACTOR SHALL SCHEDULE THE WORK WITH MR. DAVID LEEST AND GSA. STORAGE AND PARKING WILL BE PROVIDED IF POSSIBLE. C. THE CONTRACTOR MUST VISIT THE SITE TO DETERMINE THE EXACT QUANTITIES AND ANY EXTRAORDINARY PROBLEMS THAT THE AREA MAY POSE. THE ABOVE QUANTITIES ARE GOOD FAITH APPROXIMATIONS ONLY AND NOT FOR COST ESTIMATING. D. PRIOR TO START OF WORK, PLEASE SUBMIT A LIST OF PERSONNEL WHO WILL BE ON SITE WITH THE LAST FOUR DIGITS OF THEIR SOCIAL SECURITY NUMBER AND DATE OF BIRTH, LIST OF VEHICLES WITH LICENSE PLATES NUMBERS AND MATERIAL SAFETY DATA SHEETS (MSDS). WORKERS AND VEHICLES NOT ON THE LIST PREVIOUSLY SUBMITTED WILL NOT BE ADMITTED TO THE BUILDING. ONLY PRODUCTS FOR WHICH A MSDS HAS BEEN SUBMITTED AND APPROVED BY GSA WILL BE USED FOR THIS PROJECT. ANY DELAYS AND EXPENSES CAUSED BY THE FAILURE OF THE CONTRACTOR TO SUBMIT THE REQUIRED INFORMATION WILL BE BORNE BY THE CONTRACTOR.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.