RE-GROUT AND SEAL KITCHEN FLOOR SCOPE OF WORK: PROVIDE ALL QUALIFIED LABOR, SUPERVISION, MANAGEMENT, ADMINI…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- GS02P11PHP0010
- Contractor
- Awarding agency
- General Services Administration
- Sub-agency / office
- Public Buildings Service
- Award amount
- $0
- Period of performance
- Nov 10, 2010 – May 10, 2011
- NAICS
- 238990 — All Other Specialty Trade Contractors
- PSC
- PSC Z111
- Place of performance
- NY
Public award description
RE-GROUT AND SEAL KITCHEN FLOOR SCOPE OF WORK: PROVIDE ALL QUALIFIED LABOR, SUPERVISION, MANAGEMENT, ADMINISTRATION, OVERSIGHT, EQUIPMENT, MATERIALS, SUPPLIES AND INSURANCE TO: REMOVE TOP SURFACE OF EXISTING GROUT RE- GROUT WITH MATCHING GROUT MATERIAL WASH FLOOR TO ALLOW FOR SEALANT SEAL FLOOR (TILE AND GROUT) THE WORK IS TO BE PERFORMED IN CONFORMANCE WITH THE ATTACHED QUOTE FROM LIMPIEX CLEANING SERVICES INC DATED 25 OCTOBER 2010. ALL WORK MUST BE PERFORMED IN COMPLIANCE WITH OSHA, AND EPA REGULATIONS. WORK MUST BE PERFORMED WHEN THE CAFETERIA IS CLOSED. THE CONTRACTOR SHALL SCHEDULE THE WORK WITH GSA AND WITH LBB. PRIOR TO START OF WORK, PLEASE SUBMIT: 1. A LIST OF PERSONNEL WHO WILL BE ON SITE, THE LAST FOUR DIGITS OF THEIR SOCIAL SECURITY NUMBER AND THEIR DATE OF BIRTH; 2. LIST OF VEHICLES WITH LICENSE PLATES NUMBERS; 3. MSDS FOR ALL MATERIALS THAT WILL BE USED ON SITE. THE CONTRACTOR SHALL STRICTLY ADHERE TO ALL PRECAUTIONS NECESSARY TO THE SAFETY, HEALTH AND WELFARE OF THE WORKMEN IN ACCORDANCE WITH THE PROVISIONS OF THE US DEPARTMENT OF LABOR, THE OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION (OSHA) 29 CFR 1926. THE CONTRACTOR SHALL DETERMINE THE NEED FOR AND SHALL ENSURE THE USE OF PERSONAL PROTECTIVE EQUIPMENT. IF NEEDED THE EQUIPMENT WILL MEET, AT A MINIMUM, THE REQUIREMENTS OF OSHA. THE CONTRACTOR SHALL, UPON REQUEST, PROVIDE DOCUMENTATION TO PROVE THAT MECHANICS WORKING ON THE PROJECT ARE LICENSED TO WORK ON YORK SCREW CHILLERS AND TRAINED IN OSHA SAFETY REGULATIONS. THE PROJECT SHALL BE CONSIDERED COMPLETED WHEN: 1. THE INFORMATION ABOVE IS RECEIVED IN WRITTEN FORM AND ACCEPTED BY GSA. 2. THE KITCHEN FLOOR HAS A SMOOTH, CLEAN AND SEALED SURFACE. 3. ALL SUPPLIES, MATERIAL AND EQUIPMENT HAVE BEEN REMOVED FROM THE PREMISES.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.