Federal Awards · Award

TREAT AIR SHAFT WITH METACRYLICS PRODUCTS TO SEAL WALLS AGAINST WATER INFILTRATION. THE WORK SHALL BE ACCOM…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
GS02P11PHP0025
Contractor
Sub-agency / office
Public Buildings Service
Award amount
$0
Period of performance
Jan 7, 2011 – Jun 7, 2011
NAICS
238990 — All Other Specialty Trade Contractors
PSC
PSC Z111
Place of performance
NY

Public award description

TREAT AIR SHAFT WITH METACRYLICS PRODUCTS TO SEAL WALLS AGAINST WATER INFILTRATION. THE WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH METACRYLICS ENERGY EFFICIENT COATINGS PROPOSAL DATED NOVE 10, 2010 AND WITH THE FOLLOWING SCOPE OF WORK. SCOPE OF WORK: PROVIDE SUPERVISION, LABOR, ADMINISTRATIVE SUPPORT, SUPPLIES, MATERIALS, EQUIPMENT AND INSURANCE TO APPLY METACRYLICS ACRYLIC BASE AND STITCHBOARD POLYESTER FABRIC TO APPROXIMATELY 900 SQ FT OF WALL AND FLOOR SURFACE OF SHAFT WALLS. ALL WORK MUST BE PERFORMED IN COMPLIANCE WITH OSHA, NFPA, NEC AND EPA REGULATIONS/ CODES. WORK MAY BE PERFORMED DURING REGULAR BUSINESS HOURS AS LONG AS THE WORK DOES NOT DISTURB THE TENANTS. THE CONTRACTOR SHALL SCHEDULE THE WORK WITH GSA AND WITH LBB. PRIOR TO START OF WORK, PLEASE SUBMIT: 1. A LIST OF PERSONNEL WHO WILL BE ON SITE, THE LAST FOUR DIGITS OF THEIR SOCIAL SECURITY NUMBER AND THEIR DATE OF BIRTH; 2. LIST OF VEHICLES WITH LICENSE PLATES NUMBERS; 3. MSDS FOR ALL MATERIALS THAT WILL BE USED ON SITE. THE CONTRACTOR SHALL STRICTLY ADHERE TO ALL PRECAUTIONS NECESSARY TO THE SAFETY, HEALTH AND WELFARE OF THE WORKMEN IN ACCORDANCE WITH THE PROVISIONS OF THE US DEPARTMENT OF LABOR, THE OCCUPATIONAL SAFETY&HEALTH ADMINISTRATION (OSHA) 29 CFR 1926. THE CONTRACTOR SHALL DETERMINE THE NEED FOR AND SHALL ENSURE THE USE OF PERSONAL PROTECTIVE EQUIPMENT. IF NEEDED THE EQUIPMENT WILL MEET, AT A MINIMUM, THE REQUIREMENTS OF OSHA. THE CONTRACTOR SHALL, UPON REQUEST, PROVIDE DOCUMENTATION TO PROVE THAT MECHANICS WORKING ON THE PROJECT ARE LICENSED TO WORK ON YORK SCREW CHILLERS AND TRAINED IN OSHA SAFETY REGULATIONS. THE PROJECT SHALL BE CONSIDERED COMPLETED WHEN: 1. THE INFORMATION ABOVE IS RECEIVED IN WRITTEN FORM AND ACCEPTED BY GSA. 2. THE FRESH AIR SHAFT IS SEALED/ WATER TIGHT AND THE CHIEF OPERATING ENGINEER IS SATISFIED WITH THE WORK AND WITH THE RESULTS. FLOOD TESTING OF AREA MAY BE REQUIRED PRIOR TO FINAL PAYMENT. 3. ALL DEBRIS, MATERIALS, SUPPLIES AND EQUIPMENT HAS BEEN REMOVED FROM THE BUILDING. THE WORK AREAS ARE BROOM SWEPT AND LEFT IN A CLEAN AND ORDERLY CONDITION.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.