SCOPE OF WORK: PROVIDE ALL QUALIFIED/ LICENSED LABOR, SUPERVISION, MANAGEMENT, ADMINISTRATION, OVERSIGHT, E…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- GS02P11PHP0077
- Contractor
- Awarding agency
- General Services Administration
- Sub-agency / office
- Public Buildings Service
- Award amount
- $0
- Period of performance
- Jun 14, 2011 – Jun 29, 2012
- NAICS
- 238990 — All Other Specialty Trade Contractors
- PSC
- PSC Z111
- Place of performance
- NY
Public award description
SCOPE OF WORK: PROVIDE ALL QUALIFIED/ LICENSED LABOR, SUPERVISION, MANAGEMENT, ADMINISTRATION, OVERSIGHT, EQUIPMENT, MATERIALS, SUPPLIES AND INSURANCE TO: 1. REMOVE DAMAGED SHEET ROCK ON THREE SIDES SURROUNDING THE SLOP SINKS, UP TO A HEIGHT OF AT LEAST 4 FT. REMOVE THE RESULTING DEBRIS FROM THE AREA TO THE BUILDING DUMPSTER. 2. REPLACE DAMAGED WALLS WITH 5/8? THICK CONCRETE BOARD, SECURING THE BOARDS TO THE BUILDING STRUCTURE. THEN APPLY A WATER PROOF ADHESIVE, CAULKING OR TAPE AND COMPOUND TO THE SEAM BETWEEN THE NEW AND EXISTING STRUCTURES. 3. CONSTRUCT A KNEE WALL BETWEEN THE SLOP SINK AND WALL OPPOSITE THE FAUCET. THE KNEE WALL MUST BE OF A HEIGHT TO SLOP THE TOP OF THE WALL INTO THE SLOP SINK AND OF A DEPTH AND LENGTH TO COMPLETELY FILL THE AREA BETWEEN THE SINK AND ADJACENT WALLS. SECURE THE KNEE WALL TO THE BUILDING STRUCTURE THEN APPLY A WATER PROOF ADHESIVE, CAULKING OR TAPE AND COMPOUND TO THE SEAM BETWEEN THE NEW AND EXISTING STRUCTURES. 4. ADHERE A WATER PROOF, REINFORCED FIBERGLASS PANEL TO THE NEWLY CONSTRUCTED WALLS SURROUNDING THE SLOP SINK AND THE KNEE WALL. THE FIBERGLASS PANEL MUST BE INSTALLED OVER THE NEW SECTIONS OF THE WALLS AND THE KNEE WALL IN A MANNER THAT APPEARS SMOOTH, WITHOUT SEAMS. THE PANEL MUST OVERLAP THE THREE ADJACENT WALLS AND THE KNEE WALL SEAMS BY AT LEAST 6?. 5. INSTALL CAPS, MOLDING ETC. APPLY WHITE SILICONE ALONG THE PERIMETER OF THE SINK CURB. ALL WORK MUST BE PERFORMED IN COMPLIANCE WITH OSHA, AND EPA REGULATIONS/ CODES. WORK MAY BE PERFORMED DURING REGULAR BUSINESS HOURS AS LONG AS THE WORK DOES NOT DISTURB THE TENANTS. THE CONTRACTOR SHALL SCHEDULE THE WORK WITH GSA AND WITH LBB.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.