Federal Awards · Award

SCOPE OF WORK: PROVIDE ALL QUALIFIED/ LICENSED LABOR, SUPERVISION, MANAGEMENT, ADMINISTRATION, OVERSIGHT, E…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
GS02P11PHP0077
Contractor
Sub-agency / office
Public Buildings Service
Award amount
$0
Period of performance
Jun 14, 2011 – Jun 29, 2012
NAICS
238990 — All Other Specialty Trade Contractors
PSC
PSC Z111
Place of performance
NY

Public award description

SCOPE OF WORK: PROVIDE ALL QUALIFIED/ LICENSED LABOR, SUPERVISION, MANAGEMENT, ADMINISTRATION, OVERSIGHT, EQUIPMENT, MATERIALS, SUPPLIES AND INSURANCE TO: 1. REMOVE DAMAGED SHEET ROCK ON THREE SIDES SURROUNDING THE SLOP SINKS, UP TO A HEIGHT OF AT LEAST 4 FT. REMOVE THE RESULTING DEBRIS FROM THE AREA TO THE BUILDING DUMPSTER. 2. REPLACE DAMAGED WALLS WITH 5/8? THICK CONCRETE BOARD, SECURING THE BOARDS TO THE BUILDING STRUCTURE. THEN APPLY A WATER PROOF ADHESIVE, CAULKING OR TAPE AND COMPOUND TO THE SEAM BETWEEN THE NEW AND EXISTING STRUCTURES. 3. CONSTRUCT A KNEE WALL BETWEEN THE SLOP SINK AND WALL OPPOSITE THE FAUCET. THE KNEE WALL MUST BE OF A HEIGHT TO SLOP THE TOP OF THE WALL INTO THE SLOP SINK AND OF A DEPTH AND LENGTH TO COMPLETELY FILL THE AREA BETWEEN THE SINK AND ADJACENT WALLS. SECURE THE KNEE WALL TO THE BUILDING STRUCTURE THEN APPLY A WATER PROOF ADHESIVE, CAULKING OR TAPE AND COMPOUND TO THE SEAM BETWEEN THE NEW AND EXISTING STRUCTURES. 4. ADHERE A WATER PROOF, REINFORCED FIBERGLASS PANEL TO THE NEWLY CONSTRUCTED WALLS SURROUNDING THE SLOP SINK AND THE KNEE WALL. THE FIBERGLASS PANEL MUST BE INSTALLED OVER THE NEW SECTIONS OF THE WALLS AND THE KNEE WALL IN A MANNER THAT APPEARS SMOOTH, WITHOUT SEAMS. THE PANEL MUST OVERLAP THE THREE ADJACENT WALLS AND THE KNEE WALL SEAMS BY AT LEAST 6?. 5. INSTALL CAPS, MOLDING ETC. APPLY WHITE SILICONE ALONG THE PERIMETER OF THE SINK CURB. ALL WORK MUST BE PERFORMED IN COMPLIANCE WITH OSHA, AND EPA REGULATIONS/ CODES. WORK MAY BE PERFORMED DURING REGULAR BUSINESS HOURS AS LONG AS THE WORK DOES NOT DISTURB THE TENANTS. THE CONTRACTOR SHALL SCHEDULE THE WORK WITH GSA AND WITH LBB.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.