SCOPE OF WORK: PROVIDE ALL QUALIFIED LABOR, SUPERVISION, MANAGEMENT, ADMINISTRATION, OVERSIGHT, EQUIPMENT,…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- GS02P11PHP0093
- Contractor
- Awarding agency
- General Services Administration
- Sub-agency / office
- Public Buildings Service
- Award amount
- $0
- Period of performance
- Aug 4, 2011 – Feb 24, 2012
- NAICS
- 238990 — All Other Specialty Trade Contractors
- PSC
- PSC Z111
- Place of performance
- NY
Public award description
SCOPE OF WORK: PROVIDE ALL QUALIFIED LABOR, SUPERVISION, MANAGEMENT, ADMINISTRATION, OVERSIGHT, EQUIPMENT, MATERIALS, SUPPLIES AND INSURANCE TO: 1. REMOVE EXISTING DOOR, FRAME AND ASSOCIATED HARDWARE FROM THE BUILDING. 2. FABRICATE AND INSTALL 16 GAUGE, HOLLOW STEEL DOOR AND ALUMINUM FRAME. 3. FABRICATE AND ADHERE ALUMINUM CLADDING TO ENCLOSE THE TOP AND BOTTOM OF THE DOORS TO ENSURE THAT RAIN/ SNOW CANNOT ENTER THE INTERIOR OF THE DOOR AND TO PROTECT THE SIDE OF THE DOORS EXPOSED TO WEATHER. 4. PROVIDE AND INSTALL A DRIP CAP OVER THE DOOR. 5. PROVIDE AND INSTALL A SARGENT ASYLUM STYLE LOCK SET AND ASSOCIATE HARDWARE AS DESCRIBED IN ATTACHED PROPOSAL FROM KING ROSE OF NEW YORK, INC. 6. SUPPLY AND INSTALL FLUSH BOLTS TO MAKE ONE DOOR PANEL STATIONARY. 7. SUPPLY AND INSTALL WEATHER STRIPPING, DOOR SWEEP AND HAGER 5300 SERIES DOOR CLOSER. 8. REPAIR ADJACENT WALLS DAMAGED DURING THE REPAIR WORK. 9. PAINT METAL DOOR AND FRAME WITH A WATER PROOFING SILVER WITH MATTE FINISH PAINT. 10. THE WORK MUST BE PERFORMED IN ACCORDANCE WITH THE ATTACHED PROPOSAL, SUBMITTALS FROM KING ROSE OF NEW YORK INC, AND WITH INDUSTRY STANDARDS. ALL WORK MUST BE PERFORMED IN COMPLIANCE WITH OSHA, AND EPA REGULATIONS. WORK MAY BE PERFORMED DURING NORMAL BUSINESS HOURS AS LONG AS IT DOES NOT DISTURB GSA OR THE TENANTS. THE CONTRACTOR SHALL SCHEDULE THE WORK WITH GSA AND WITH THE COURT. PRIOR TO START OF WORK, PLEASE SUBMIT: 1. A LIST OF PERSONNEL WHO WILL BE ON SITE, THE LAST FOUR DIGITS OF THEIR SOCIAL SECURITY NUMBER AND THEIR DATE OF BIRTH; 2. LIST OF VEHICLES WITH LICENSE PLATES NUMBERS; 3. MSDS FOR ALL MATERIALS THAT WILL BE USED ON SITE. THE CONTRACTOR SHALL STRICTLY ADHERE TO ALL PRECAUTIONS NECESSARY TO THE SAFETY, HEALTH AND WELFARE OF THE WORKMEN IN ACCORDANCE WITH THE PROVISIONS OF THE US DEPARTMENT OF LABOR, THE OCCUPATIONAL SAFETY&HEALTH ADMINISTRATION (OSHA) 29 CFR 1926. THE CONTRACTOR SHALL DETERMINE THE NEED FOR AND SHALL ENSURE THE USE OF PERSONAL PROTECTIVE EQUIPMENT. IF NEEDED THE EQUIPMENT WILL MEET, AT A MINIMUM, THE REQUIREMENTS OF OSHA. THE CONTRACTOR SHALL, UPON REQUEST, PROVIDE DOCUMENTATION TO PROVE THAT MECHANICS WORKING ON THE PROJECT ARE LICENSED TO WORK ON YORK SCREW CHILLERS AND TRAINED IN OSHA SAFETY REGULATIONS. THE PROJECT SHALL BE CONSIDERED COMPLETED WHEN: 1. THE INFORMATION ABOVE IS RECEIVED IN WRITTEN FORM AND ACCEPTED BY GSA. 2. THE DOORS ARE INSTALLED AND OPERATE TO THE SATISFACTION OF THE CHIEF OPERATING ENGINEER AND GSA 3. DAMAGES TO THE ADJACENT WALLS AND DOOR FRAMES CAUSED BY THIS PROJECT ARE REPAIRED IN A PROFESSIONAL AND WORKMAN LIKE MANNER. 3. ALL SUPPLIES, MATERIAL AND EQUIPMENT HAVE BEEN REMOVED FROM THE PREMISES. 4. THE AREA IS CLEAN AND SHOWS NO SIGNS OF DAMAGE THAT RESULTED FROM THIS WORK.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.