CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO REPLACE COMPRESSOR FROM MCQUAY…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- GSP0907WB0047
- Contractor
- Awarding agency
- General Services Administration
- Sub-agency / office
- Public Buildings Service
- Award amount
- $0
- Period of performance
- Jul 16, 2007 – Aug 20, 2007
- NAICS
- 235950
- PSC
- PSC Z111
- Place of performance
- CA
- Parent award
- GS09P00KSC0069
Public award description
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO REPLACE COMPRESSOR FROM MCQUAY RPSO51B UNIT IN B11. PUMP OUT SYSTEM AND RECOVER REFRIGERANT FROM UNIT. REMOVE EXISTING DEFECTIVE COMPRESSOR AND CRANE LIFT A NEW ONE INTO PLACE AND INSTALL. TEST OIL BURNOUT. NITROGEN LEAK TEST UNIT, EVACUATE AND CHARGE WIT R22. CHARGE START AND TEST UNIT. FOLLOW UP AND CHANGE DRIER. CRANE LIFT FROM LOADING DOCK AREA. REMOVE AND REPLACE MANUAL OIL SAFETY SWITCH. CEK- CONDENCER ENHANCEMENT KIT -OIL SEPARATOR AND ALL ASSOCIATED PIPING / ELECTRICAL. INSTALL (1) ONE KIT ON CIRCUIT 1 ONLYAS DESCRIBED IN ATTACHED PROCEDURE LETTER. INSPECT UNIT PRIOR TO WORK AND NOTE OPERATION AND ANY DEFICIENCEIS. REMOVE AND STOR ETHE CIRCUIT REFRIGERANR CHARGE VIA EPA APPROVED METHOD. INSTALL OIL SEPARATOR AND RELATED ACCESSORIES, MAKING NECESSARY COMPRESSOR AND REFRIGERANT CIRCUIT MODIFICATION. INSTALL NEW MICRO TECH CONTROL SOFTWARE. MAKE ANY NECESSARY ELECTRICAL MODIFICATION . INSTALL NEW OIL CHARGE , LEAK CHECK, EVACUATE AND REINSTALL NSTORED REFRIGERANT. PLACE CIRCUIT BACK IN OPERATION AND MAKE COMPLETE OPERATIONAL CHECK OF THE SYSTEM. PROVIDE WRITTEN REPORT WITH RECOMMENDATION FOR OTHER DISCOVERED REPAIR OR SYSTEM CHECKS. SSK- SOFT START KIT. INSTALL (1) SOFT START KITON CIRCUIT 1 ONLY, AS DESCRIBED IN ATTACHED PROCEDURE LETTER. DEPENDING ON UNIT CONFIGURATION COMPRESSOR SIZE AND VOLTAGE, THE SSK MAY BE INSTALLED IN THE EXISTING UNIT POWER COMPARTMENT OR IN A SEPARATE ENCLOSURE BY COMPRESSOR. MAKE ANY NECESSARY POWER AND CONTROL WIRING MODIFICATIONS. ALL PROGRAMMING AND TESTING SHALL TAKE PLACE DURING NORMAL WORKING HOURS. INTALL (2) DUCTLESS A/C UNIT: INSTALL 2 A/C DUCTLESS EVAPORATOR, ONE IN TELEMETRY LAB AND THE OTHER IN THE LASER LAB. INSTALL (2)DUCTLESS CONDENSERS ABOVE THE CEILING NEAR EACH UNIT AND CONNECT WITH LINE SET. FULL AND COMPLETE THE INSTAKLATION TO MANUFACTURER SPECIFICATION. PROVIDE ELECTRICAL POWER TO EACH UNIT FROM LOCAL PANEL. CHARGE, START AND TEST UNITS. CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE, CITY AND ALL LOCAL CODES THAT APPLY TO THIS PROJECT. ANTICIPATED START DATE: 7/16/2007 ANTICIPATED REQUIRED COMPLETION DATE: 8/20/2007
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.