Federal Awards · Award

CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO REPLACE COMPRESSOR FROM MCQUAY…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
GSP0907WB0047
Contractor
Sub-agency / office
Public Buildings Service
Award amount
$0
Period of performance
Jul 16, 2007 – Aug 20, 2007
NAICS
235950
PSC
PSC Z111
Place of performance
CA
Parent award
GS09P00KSC0069

Public award description

CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO REPLACE COMPRESSOR FROM MCQUAY RPSO51B UNIT IN B11. PUMP OUT SYSTEM AND RECOVER REFRIGERANT FROM UNIT. REMOVE EXISTING DEFECTIVE COMPRESSOR AND CRANE LIFT A NEW ONE INTO PLACE AND INSTALL. TEST OIL BURNOUT. NITROGEN LEAK TEST UNIT, EVACUATE AND CHARGE WIT R22. CHARGE START AND TEST UNIT. FOLLOW UP AND CHANGE DRIER. CRANE LIFT FROM LOADING DOCK AREA. REMOVE AND REPLACE MANUAL OIL SAFETY SWITCH. CEK- CONDENCER ENHANCEMENT KIT -OIL SEPARATOR AND ALL ASSOCIATED PIPING / ELECTRICAL. INSTALL (1) ONE KIT ON CIRCUIT 1 ONLYAS DESCRIBED IN ATTACHED PROCEDURE LETTER. INSPECT UNIT PRIOR TO WORK AND NOTE OPERATION AND ANY DEFICIENCEIS. REMOVE AND STOR ETHE CIRCUIT REFRIGERANR CHARGE VIA EPA APPROVED METHOD. INSTALL OIL SEPARATOR AND RELATED ACCESSORIES, MAKING NECESSARY COMPRESSOR AND REFRIGERANT CIRCUIT MODIFICATION. INSTALL NEW MICRO TECH CONTROL SOFTWARE. MAKE ANY NECESSARY ELECTRICAL MODIFICATION . INSTALL NEW OIL CHARGE , LEAK CHECK, EVACUATE AND REINSTALL NSTORED REFRIGERANT. PLACE CIRCUIT BACK IN OPERATION AND MAKE COMPLETE OPERATIONAL CHECK OF THE SYSTEM. PROVIDE WRITTEN REPORT WITH RECOMMENDATION FOR OTHER DISCOVERED REPAIR OR SYSTEM CHECKS. SSK- SOFT START KIT. INSTALL (1) SOFT START KITON CIRCUIT 1 ONLY, AS DESCRIBED IN ATTACHED PROCEDURE LETTER. DEPENDING ON UNIT CONFIGURATION COMPRESSOR SIZE AND VOLTAGE, THE SSK MAY BE INSTALLED IN THE EXISTING UNIT POWER COMPARTMENT OR IN A SEPARATE ENCLOSURE BY COMPRESSOR. MAKE ANY NECESSARY POWER AND CONTROL WIRING MODIFICATIONS. ALL PROGRAMMING AND TESTING SHALL TAKE PLACE DURING NORMAL WORKING HOURS. INTALL (2) DUCTLESS A/C UNIT: INSTALL 2 A/C DUCTLESS EVAPORATOR, ONE IN TELEMETRY LAB AND THE OTHER IN THE LASER LAB. INSTALL (2)DUCTLESS CONDENSERS ABOVE THE CEILING NEAR EACH UNIT AND CONNECT WITH LINE SET. FULL AND COMPLETE THE INSTAKLATION TO MANUFACTURER SPECIFICATION. PROVIDE ELECTRICAL POWER TO EACH UNIT FROM LOCAL PANEL. CHARGE, START AND TEST UNITS. CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE, CITY AND ALL LOCAL CODES THAT APPLY TO THIS PROJECT. ANTICIPATED START DATE: 7/16/2007 ANTICIPATED REQUIRED COMPLETION DATE: 8/20/2007

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.