Federal Awards · Award

CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO: PROVIDE AND INTALL POWER BASE…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
GSP0907WB0062
Contractor
Sub-agency / office
Public Buildings Service
Award amount
$0
Period of performance
Sep 18, 2007 – Dec 31, 2007
NAICS
561790 — Other Services to Buildings and Dwellings
PSC
PSC Z111
Place of performance
CA
Parent award
GS09P01KSC0044

Public award description

CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO: PROVIDE AND INTALL POWER BASE FEEDS FOR THE NEW SYSTEM FURNITURES. CONTRACTOR SHALL TEST AND CHECK EXISTING OUTLETS THAT MAYBE USED FOR THE SYSTEM FURNITURE, TO MAKE SURE IT CAN CARRY ADDITIONAL LOAD. OTHERWISE PROCEED TO TAKE POWER FROM THE PANEL LOCATED IN ELECTRICAL/PHONE CLOSET BY THE HALLWAY. IF NO AVAILABLE BREAKER, USE POWER TO THE A/C UNIT WHICH HAVE BEEN ABANDONED. INTERCEPT WIRING ABOVE CEILING AND RUN CONDUIT TO BASE FEED LOCATIONS.CONTRACTOR SHALL HARD WIRE ONE END OF WHIPS TO BASE FEEDS AND THE OTHER END TO SYSTEM FURNITURES.CONTRACTOR SHALL DO A FINAL TEST TO ALL BASE FEEDS AND SYSTEM FURNITURE CONNECTIONS TO MAKE SURE THAT EACH SECTION HAS POWER AT THE BASE OF SYSTEM FURNITURES. CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE, CITY AND LOCAL CODES THAT APPLY TO THIS PROJECT. ANTICIPATED WORK START DATE: 08/20/2007. ANTICIPATED REQUIRED COMPLETION DATE 08/30/2007.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.