1. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIAL TO REMOVE AND DISPOSE OF APPROXIMATELY 46 LINEAR FEET OF…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- GSP0908WH5079
- Contractor
- Awarding agency
- General Services Administration
- Sub-agency / office
- Public Buildings Service
- Award amount
- $0
- Period of performance
- Sep 4, 2008 – Nov 7, 2008
- NAICS
- 236220 — Commercial and Institutional Building Construction
- PSC
- PSC Z111
- Place of performance
- CA
- Parent award
- GS09P03KSD0082
Public award description
1. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIAL TO REMOVE AND DISPOSE OF APPROXIMATELY 46 LINEAR FEET OF SLAB TO SLAB WALL AND REMOVE 2 DOORS AND FRAMES AND TURN OVER TO GSA. 2. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIAL TO REPAIR EXISTING WALLS WHERE WALLS AND DOORS WERE REMOVED. 3. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIAL TO PATCH AND PAINT THE ENTIRE OFFICE SPACE. 4. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIAL TO REMOVE EXISTING ROLLED CARPETING IN ALL OF ROOM 1037, PREP FLOOR AND INSTALL NEW CARPET TILE. 5. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIAL TO INSTALL NEW COVE BASE THROUGHOUT THE ENTIRE SPACE. 6. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIAL TO ALIGN, REPAIR, AND REPLACE CEILING TILES AND GRID WHERE SLAB TO SLAB WALLS WERE REMOVED AND ANY AREAS DISTURBED OR DAMAGED BY CONSTRUCTION. 7. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIAL TO REVERSE THE SWING ON THE CONFERENCE ROOM DOOR. 8. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIAL TO RELOCATE CONFERENCE ROOM LIGHT SWITCH FROM SOUTH WALL TO NORTH WALL BY DOOR. 9. THE CONTRACTOR SHALL PROVIDE A TOTAL OF 16 VOICE AND DATA DROPS CONSISTING OF 2 DATA AND ONE VOICE. 10. THE CONTRACTOR SHALL PROVIDE ELECTRICAL POWER FOR THE INSTALLATION OF 9 NEW CUBICLES. 11. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIALS TO REALIGN THE LIGHTING AND SWITCHING IN THE SPACE SO THAT THERE IS ADEQUATE LIGHTING AND CONTROLS IN THE AREA THAT WALLS WERE REMOVED. 12. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIAL TO RELOCATE THE AIRPHONE INTERCOM SYSTEMS INTERIOR STATIONS FOR THE FRONT DOOR. 13. THE EXISTING FIRE SPRINKLERS SHALL NOT BE DISTURBED UNLESS NECESSARY TO PROVIDE ADEQUATE COVERAGE. 14. WORK WILL BE ACCOMPLISHED DURING NORMAL WORK HOURS. NOISE, DUST AND HALLWAY TRAFFIC MUST BE CONTROLLED TO ACCEPTABLE LEVELS. 15. THE CONTRACTOR SHALL DISPOSE OF ALL DEMO/CONSTRUCTION MATERIAL IN ACCORDANCE WITH APPROVED DISPOSAL METHODS.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.