THE CONTRACTOR SHALL PROVIDE LABOR, MATERIALS AND SUPERVISION FOR THE REMOVAL OF THE EXISTING ENTRANCE AND…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- GSP0909WH5040
- Contractor
- Awarding agency
- General Services Administration
- Sub-agency / office
- Public Buildings Service
- Award amount
- $0
- Period of performance
- Jul 15, 2009 – Sep 30, 2009
- NAICS
- 561210 — Facilities Support Services
- PSC
- PSC Y111
- Place of performance
- CA
- Parent award
- GS09P06KSD3016
Public award description
THE CONTRACTOR SHALL PROVIDE LABOR, MATERIALS AND SUPERVISION FOR THE REMOVAL OF THE EXISTING ENTRANCE AND EXIT BARRIERS. CLEAN, REPAIR, REPAINT BARRIERS AND CAMPARTMENTS, MAKE NECESSARY REPAIRS TO THE LOWER GUTTER FOR SMOOTH PATH OF HOSES. REINSTALLATION OF THE EXIT AND ENTRANCE BARRIERS, REPLACE DAMEGED COOL BOARD INSIDE THE H.P.U.; IDENTIFY AND LABEL ALL CONTROLS AND POWER WIRES INSIDE THE H.P.U.; IDENTIFY AND LABEL WIRE DIAGRAM FOR ALL EQUIPMENT. BLEED AND TEST. INSTALLATION OF NEW HYDRAULIC LINES AND FIITINGS SO THERE IS NO RUBBING OR CONTACT OF ANY STRUCTURES. HYDRAULIC LINES AND FITTINGS WILL BE FULL PRESSURD RANGE UP TO 6000 PSI AND ALL DAMAGE AND INCORRECT LINES AND FITTINGS WILL BE REPLACED BY THE CONTRACTOR. INSTALLATION OF WATERPROOF SILICONE WHICH INCLUDES COVERLINES, FITTINGS, AND LOWER GUTTER CONTAINING LINES AND FITTINGS WITH WATERPROOV SILICONE. INSTALLATION OF PHOTO CELL REVERSING SYSTEM; INSTALLATION OF REVERSING LOOP OUTSIDE OF THE EXIT GATE ON MISSION STREET AND TESTING OF ALL EQUIPMENT RELATED TO THE PROJECT.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.