THE CONTRACTOR SHALL PROVIDE LABOR, MATERIALS TO INSTALL DEDICATED ELECTRICAL OUTLET IN SMALL LIBRARY ON TH…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- GSP0910WH5015
- Contractor
- Awarding agency
- General Services Administration
- Sub-agency / office
- Public Buildings Service
- Funding agency
- Department of the Treasury
- Award amount
- $0
- Period of performance
- Mar 19, 2010 – Apr 30, 2010
- NAICS
- 236220 — Commercial and Institutional Building Construction
- PSC
- PSC Y111
- Place of performance
- CA
- Parent award
- GS09P09KSD0124
Public award description
THE CONTRACTOR SHALL PROVIDE LABOR, MATERIALS TO INSTALL DEDICATED ELECTRICAL OUTLET IN SMALL LIBRARY ON THE 14TH FLOOR. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIAL TO CONSTRUCT A CEILING HIGH WALL TO DIVIDE OFFICE INTO TWO SEPARATE OFFICES OF EQUAL SIZE IN SUITE 800. THE WALL SHALL BE INSULATE WITH R-13. THE CONTRACTOR SHALL PROVIDE LABOR MATERIALS TO ADD ONE ADDITIONAL LIGHT AND EQUALLY DISTRIBUTE THE LIGHTING BETWEEN THE TWO SPACES, THE LIGHTING SHALL BE SEPARATELY CONTROLLED IN THE INDIVIDUAL SPACES. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIALS TO RELOCATE ONE FIRE ALARM SPEAKER STROBE AND INSTALL ONE NEW SPEAKER STROBE TO MATCH EXISTING. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIAL TO SPLIT THE VENTILATION EQUALLY BETWEEN SPACES.(EACH SPACE SHOULD HAVE ITS OWN SUPPLY AND RETURN WITH SOUND BOOTS) THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIALS TO INSTALL ONE NEW FIRE SPRINKLER. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIALS TO REPAIR CEILING GRID AND TILE. THE CONTRACTOR SHALL PROVIDE AND INSTALL NEW BASE COVE TO MATCH EXISTING ON NEW WALL AND AREAS WHERE DAMAGED BY CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIALS TO PAINT THE ENTIRE INTEROR OF BOTH NEW OFFICE SPACES; ALL FINISHES TO MATCH EXISTING. WORK SHALL BE ACCOMPLISHED DURING NORMAL BUSINESS HOURS, NOISE, DUST AND HALLWAY TRAFFIC MUST BE CONTROLLED TO ACCEPTABLE LEVELS AND KEEPING THE WORK AREA CLEAN AND IN SAFE CONDITION AT ALL TIMES. DISPOSE OF ALL DEMO/CONSTRUCTION MATERIAL IN ACCORDANCE WITH APPROVED DISPOSAL METHODS. CONTRACTOR SHALL PROVIDE BUILDING OWNER OF HIS REPRESENTATIVE A COPY OF BOND INSURANCE AND ALL REQUIRED PERMITS PRIOR TO THE START OF WORK AND COMPLY WITH ALL BUILDING RULES; AND SHALL GIVE GSA A COPY OF ALL APPPROVED BUILDING PERMITS REQUIRED BY THE CITY OF SAN FRANCISCO, PRIOR THO RECEIVING FINAL PAYMENT.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.