Federal Awards · Award

THE CONTRACTOR SHALL PROVIDE LABOR, MATERIALS TO INSTALL DEDICATED ELECTRICAL OUTLET IN SMALL LIBRARY ON TH…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
GSP0910WH5015
Contractor
Sub-agency / office
Public Buildings Service
Funding agency
Department of the Treasury
Award amount
$0
Period of performance
Mar 19, 2010 – Apr 30, 2010
NAICS
236220 — Commercial and Institutional Building Construction
PSC
PSC Y111
Place of performance
CA
Parent award
GS09P09KSD0124

Public award description

THE CONTRACTOR SHALL PROVIDE LABOR, MATERIALS TO INSTALL DEDICATED ELECTRICAL OUTLET IN SMALL LIBRARY ON THE 14TH FLOOR. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIAL TO CONSTRUCT A CEILING HIGH WALL TO DIVIDE OFFICE INTO TWO SEPARATE OFFICES OF EQUAL SIZE IN SUITE 800. THE WALL SHALL BE INSULATE WITH R-13. THE CONTRACTOR SHALL PROVIDE LABOR MATERIALS TO ADD ONE ADDITIONAL LIGHT AND EQUALLY DISTRIBUTE THE LIGHTING BETWEEN THE TWO SPACES, THE LIGHTING SHALL BE SEPARATELY CONTROLLED IN THE INDIVIDUAL SPACES. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIALS TO RELOCATE ONE FIRE ALARM SPEAKER STROBE AND INSTALL ONE NEW SPEAKER STROBE TO MATCH EXISTING. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIAL TO SPLIT THE VENTILATION EQUALLY BETWEEN SPACES.(EACH SPACE SHOULD HAVE ITS OWN SUPPLY AND RETURN WITH SOUND BOOTS) THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIALS TO INSTALL ONE NEW FIRE SPRINKLER. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIALS TO REPAIR CEILING GRID AND TILE. THE CONTRACTOR SHALL PROVIDE AND INSTALL NEW BASE COVE TO MATCH EXISTING ON NEW WALL AND AREAS WHERE DAMAGED BY CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIALS TO PAINT THE ENTIRE INTEROR OF BOTH NEW OFFICE SPACES; ALL FINISHES TO MATCH EXISTING. WORK SHALL BE ACCOMPLISHED DURING NORMAL BUSINESS HOURS, NOISE, DUST AND HALLWAY TRAFFIC MUST BE CONTROLLED TO ACCEPTABLE LEVELS AND KEEPING THE WORK AREA CLEAN AND IN SAFE CONDITION AT ALL TIMES. DISPOSE OF ALL DEMO/CONSTRUCTION MATERIAL IN ACCORDANCE WITH APPROVED DISPOSAL METHODS. CONTRACTOR SHALL PROVIDE BUILDING OWNER OF HIS REPRESENTATIVE A COPY OF BOND INSURANCE AND ALL REQUIRED PERMITS PRIOR TO THE START OF WORK AND COMPLY WITH ALL BUILDING RULES; AND SHALL GIVE GSA A COPY OF ALL APPPROVED BUILDING PERMITS REQUIRED BY THE CITY OF SAN FRANCISCO, PRIOR THO RECEIVING FINAL PAYMENT.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.