PROJECT: 69KV AND 12KV OVERHEAD LINE POLE UPGRADE PROJECT, PINAL COUNTY, ARIZONA. SERVICES ARE FOR ELECTRIC…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- INA12PD01377
- Contractor
- Awarding agency
- Department of the Interior
- Sub-agency / office
- Bureau of Indian Affairs and Bureau of Indian Education
- Award amount
- $0
- Period of performance
- Sep 19, 2012 – Nov 30, 2012
- NAICS
- 541330 — Engineering Services
- PSC
- PSC C222
- Place of performance
- AZ
- Parent award
- INA12PC00001
Public award description
PROJECT: 69KV AND 12KV OVERHEAD LINE POLE UPGRADE PROJECT, PINAL COUNTY, ARIZONA. SERVICES ARE FOR ELECTRICAL/CIVIL ENGINEER(S), DESIGNERS(S), SURVEYOR(S), AND CAD OPERATOR(S) PROVIDING ENGINEERING SUPPORT TO SCIP TO PROVIDE FOR THE DEVELOPMENT OF AN ENGINEERING DESIGN AND REQUEST FOR PROPOSAL TECHNICAL SPECIFICATION PACKAGE FOR THE REPLACEMENT OF EXISTING OVERHEAD 69KV TRANSMISSION AND 12KV DISTRIBUTION POLES IDENTIFIED BY SCIP AS IN SUB-STANDARD CONDITION DUE TO AGE AND WEATHERING. IDENTIFIED POLES PROVIDE SUPPORT OF TWO (2) 69KV INTERSTATE 10 OVERHEAD LINE CROSSINGS (POLE NUMBERS: 15112, 15173, 15660, 15659), ONE (1) 12KV INTERSTATE 10 OVERHEAD LINE CROSSING (POLE NUMBERS: 48473, 48472) AND ONE 69KV THREE WAY SWITCH SUPPORT POLE (POLE NUMBERS: 15668) ALL LOCATED JUST NORTH OF CASA GRANDE, AZ ON THE GILA RIVER INDIAN COMMUNITY.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.