IGF::OT::IGF OTHER,HVAC COST-SAVING EFFICIENCY AND LOW SOUND LEVELS. A SUCTION LINE FILTER-DRIER WITH AN EX…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- INP14PX02001
- Contractor
- Awarding agency
- Department of the Interior
- Sub-agency / office
- National Park Service
- Award amount
- $0
- Period of performance
- Jun 18, 2014 – Jul 18, 2014
- NAICS
- 238220 — Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- MA
Public award description
IGF::OT::IGF OTHER,HVAC COST-SAVING EFFICIENCY AND LOW SOUND LEVELS. A SUCTION LINE FILTER-DRIER WITH AN EXCESSIVE PRESSURE DROP ACROSS IT SHOULD NOT BE LEFT IN A SYSTEM. AN EXCESSIVE PRESSURE DROP IN THE SUCTION LINE REDUCES THE VOLUMETRIC EFFICIENCY OF THE COMPRESSOR, THUS REDUCING SYSTEM OPERATING CAPACITY. EMERGENCY REPLACEMENT OF AC COMPRESSOR. THIS PROJECT IS AM EMERGENCY REMOVAL OF FAILED EXISTING COMPRESSOR AT SPRINGFIELD ARM ORY NATIONAL HISTORIC SITE, THEN SUPPLY AND REPLACE WITH NEW COMPRESSOR AND RECHARGE THE SYSTEM.CONTRACTOR SHALL START BY REMOVING A LL REMAINING REFRIGERANT FROM THE CURRENT COMPRESSOR, THEN REMOVING AND DISPOSING OF THE EXISTING COPELAND COMPRESSOR.THE CONTRACTOR WILL THEN SUPPLY AND INSTALL A NEW COMPRESSOR. FOLLOWING INSTALLATION, THE CONTRACTOR WILL VACUUM DOWN AND RECHARGETHE SYSTEM.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.
Related intelligence
- Agency: Department of the Interior
- PSC J043 — Product Service Code J043
- Federal market intelligence software