Federal Awards · RIDGWAY VALLEY ENTERPRISES INC · Award

IGF::OT::IGF CONSTRUCT RV SITES AT SANFORD YAKE PART OF LAKE MEREDITH NATIONAL RECREATION AREA, FRITCH, TEX…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
INP17PD02281
Contractor
RIDGWAY VALLEY ENTERPRISES INC
Sub-agency / office
National Park Service
Award amount
$370,344
Period of performance
Dec 14, 2017 – May 30, 2018
NAICS
236220 — Commercial and Institutional Building Construction
Parent award
INP13PC00009

Public award description

IGF::OT::IGF CONSTRUCT RV SITES AT SANFORD YAKE PART OF LAKE MEREDITH NATIONAL RECREATION AREA, FRITCH, TEXAS. SCOPE OF WORK: ALL WORK, TERMS AND CONDITIONS, CLAUSES AND PROVISIONS, AS STATED IN TASK ORDER REQUEST T0040338372, WITH ALL ATTACHMENTS, IS HEREIN EXPRESSLY INCORPORATED INTO THIS CONTRACT, LESS LINE ITEM 4 LIVING AREAS. CONTRACT LINE ITEM NO. 1 SITE ASSESSMENT AND SURVEY: THIS ITEM CONSISTS OF A SITE VISIT TO PROVIDE RECOMMENDATIONS AND A DETAILED SCOPE OF WORK. THIS WORK ALSO CONSISTS OF CONDUCTING A SURVEY OF THE PROPOSED LOCATION TO REVEAL AND IDENTIFY WEAKNESSES IN EXISTING AND PLANNED USE. THIS ITEM ALSO CONSISTS OF A TOPOGRAPHIC SURVEY OF SUFFICIENT DETAIL TO COMPLETE DESIGN AND CONSTRUCTION OF THE FACILITY. CONTRACT LINE ITEM NO. 2 DESIGN: THIS ITEM CONSISTS OF ENGINEER DRAWINGS AND SPECIFICATIONS, PRODUCT DATASHEETS, SHOP DRAWINGS, SCHEMATICS, AND RECORDS OF DETAILED ANALYSIS. ALSO INCLUDES PROVIDING SCHEMATIC DRAWINGS, FINAL DRAWINGS AND SPECIFICATIONS, COST PROPOSALS FOR CONSTRUCTION, AND LAYOUT PLANS. THIS ITEM ALSO INCLUDES THE COSTS OF GETTING THE PERMITS AND NPS APPROVAL FOR CONSTRUCTION, WHICH INCLUDES ANY PERMIT APPLICATION FEES. CONTRACT LINE ITEM NO. 3 CONCRETE RV SITE PADS: THIS ITEM CONSISTS OF THE CONSTRUCTION AND INSTALLATION OF TEN CONCRETE RV SITE PADS. CONSTRUCTION SHALL COMPLY WITH INDUSTRY STANDARDS. PAYMENT SHALL BE FULL COMPENSATION FOR ALL MATERIAL AND ASSEMBLY RELATED TO THE CONCRETE PAD; CLEARING; EXCAVATION; RESTORATION OF ALL EXISTING ROADS, SIDEWALKS, AND DRIVEWAYS, PROTECTION OF EXISTING UTILITIES; COMPACTION; GRADING; PROVISION OF RECORD DRAWINGS AS-BUILTS, SUPPLEMENTARY CONSTRUCTION STAKING, TESTING, AND ALL EQUIPMENT AND MATERIALS REQUIRED. THIS ALSO INCLUDES FINAL GRADING DISTURBED AREAS WITH NATIVE TOPSOIL, REVEGETATION, AND BRINGING TO FINAL GRADE. THIS ITEM ALSO INCLUDES MOBILIZATION, COSTS OF PREPARATORY WORK AND OPERATIONS, INCLUDING BUT NOT LIMITED TO THOSE NECESSARY FOR THE MOVEMENT OF PERSONNEL, EQUIPMENT, SUPPLIES, MATERIALS AND INCIDENTALS TO THE PROJECT SITE, SITE FACILITIES NECESSARY FOR THE WORK ON THE PROJECT, SANITARY FACILITIES, TRAFFIC CONTROL, ALL OTHER WORK OR COSTS NECESSARY FOR THE COMPLETION OF THE PROJECT, INSPECTIONS, TESTING, SYSTEM STARTUP, PROJECT CLOSEOUT, PUNCHLISTS, FINAL CLEANUP AND DEMOBILIZATION FROM THE PROJECT SITE UPON COMPLETION OF WORK. ALSO INCLUDED ARE COSTS RELATED TO FEES, PERMITS, LICENSES, INSURANCE, BONDS, TAXES AND ALL OTHER COSTS THAT THE CONTRACTOR IS TO OBTAIN OR PAY TO PERFORM THE WORK. FINALLY, IT INCLUDES CONSTRUCTION MANAGEMENT AND INSPECTION. CONTRACT LINE ITEM 4 LIVING AREAS HAS BEEN REMOVED FROM THIS CONTRACT.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.