RECOVERY-FLATIRON POWERPLANT, RECOATING AND RELINING OF PENSTOCKS 1 AND 2, COLORADO-BIG THOMPSON PROJECT, C…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- INR10PC60R14
- Contractor
- Awarding agency
- Department of the Interior
- Sub-agency / office
- Bureau of Reclamation
- Award amount
- $14,127,872
- Period of performance
- Sep 17, 2010 – Oct 29, 2011
- NAICS
- 238990 — All Other Specialty Trade Contractors
- PSC
- PSC Z223
- Place of performance
- CO
Public award description
RECOVERY-FLATIRON POWERPLANT, RECOATING AND RELINING OF PENSTOCKS 1 AND 2, COLORADO-BIG THOMPSON PROJECT, COLORADO. (TAS::14 0681::TAS, BUREAU PROJECT IDENTIFICATION NUMBER 10.000) THIS PROJECT IS FUNDED BY THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (ARRA). THE PRINCIPAL COMPONENTS OF THE WORK CONSIST OF: REMOVING COATING SYSTEM FROM EXTERIOR OF PENSTOCKS NOS. 1 AND 2, INCLUDING REMOVING, HANDLING, AND DISPOSING OF PAINT CONTAINING LEAD AND OTHER HEAVY METALS. PREPARING SURFACE AND APPLYING NEW COATING SYSTEM TO EXTERIOR OF PENSTOCKS NOS. 1 AND 2. REMOVING AND DISPOSING OF LINING SYSTEM FROM INTERIOR OF PENSTOCKS NOS. 1 AND 2, INCLUDING REMOVING, HANDLING, AND DISPOSING OF PAINT CONTAINING COAL TAR PRODUCTS. PREPARING SURFACE AND APPLYING NEW LINING SYSTEM TO INTERIOR OF PENSTOCKS NOS. 1 AND 2. REMOVING AND DISPOSING OF COATING SYSTEM FROM STEEL WORK PLATFORM SUPPORTS, STAIRS, AND HANDRAILS AT VALVE STRUCTURE AND UPSTREAM OF ANCHOR NO. 14; PREPARING SURFACE AND RECOATING. REMOVING COATING SYSTEM FROM THE INTERIOR AND EXTERIOR OF THE 84-INCH BUTTERFLY VALVES, INCLUDING REMOVING, HANDLING, AND DISPOSING OF PAINT CONTAINING LEAD AND OTHER HEAVY METALS. PREPARING SURFACE AND RECOAT THE INTERIOR AND EXTERIOR OF THE 84-INCH BUTTERFLY VALVES.