Federal Awards · Award

PROJECT TITLE: ROAD REPAIR - SUSIE PEAK ROAD, BELLE FOURCHE RESERVOIR, BELLE FOURCHE UNIT, SOUTH DAKOTA THE…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
INR11PC60435
Contractor
Sub-agency / office
Bureau of Reclamation
Award amount
$0
Period of performance
Sep 30, 2011 – Nov 20, 2011
NAICS
238910 — Site Preparation Contractors
PSC
PSC Z222
Place of performance
SD

Public award description

PROJECT TITLE: ROAD REPAIR - SUSIE PEAK ROAD, BELLE FOURCHE RESERVOIR, BELLE FOURCHE UNIT, SOUTH DAKOTA THE WORK INCLUDES THE FOLLOWING: TOE DRAIN INSTALLATION ALONG SUSIE PEAK ROAD AT STA. 40+50, 91+00, AND 109+50. 1. REMOVE AND STORE GRAVEL SURFACE. 2. EXCAVATING 420 FT OF PIPE TRENCH ACROSS AND ALONG BOTH SIDES OF SUSIE PEAK ROAD. 3. INSTALLATION OF DRAINAGE FABRIC WRAP IN TRENCH AROUND DRAINAGE MATERIAL AND PIPE. 4. PLACING 40 CYD OF DRAINAGE MATERIAL AROUND PIPE. 5. INSTALLING 300 FT OF DOUBLE WALLED, PERFORATED, CORRUGATED HDPE PIPE. 6. INSTALL 180 FT OF DOUBLE WALLED, CORRUGATED HDPE PIPE. 7. COMPACT AND FILL 420 FT LONG PIPE TRENCH. 8. REPAIR AND GRAVEL ROAD EMBANKMENT DISTURBED BY EXCAVATION. 9. SHAPE CROWN OF ROAD IN AREAS REPAIRED AND GRAVELED. 10. PLACE SALVAGE SOIL AT THE DITCHES AND OTHER DISTURBED AREAS. 11. REFORM ANY DITCHES DISTURBED BY WORK.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.