TWO FULLY HYBRIDIZED AND PACKAGED GE:SB349 FOCAL- PLANE ARRAYS THE GOAL OF THIS PROJECT IS TO CONSTRUCT A 3…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- NNA08BA04P
- Contractor
- Awarding agency
- National Aeronautics and Space Administration
- Sub-agency / office
- National Aeronautics and Space Administration
- Award amount
- $0
- Period of performance
- Jun 23, 2008 – Jun 30, 2008
- NAICS
- 333314 — Optical Instrument and Lens Manufacturing
- PSC
- PSC AR94
- Place of performance
- CA
Public award description
TWO FULLY HYBRIDIZED AND PACKAGED GE:SB349 FOCAL- PLANE ARRAYS THE GOAL OF THIS PROJECT IS TO CONSTRUCT A 32X32 GE:SB FOCAL-PLANE ARRAY (FPA) HYBRIDIZED, BY THE PLANAR BUMP-BOND TECHNIQUE, TO A SB349 CTIA READOUT. AS DEPICTED IN THE FIGURE BELOW. THIS DESIGN IS IDENTICAL TO WHAT IS COMMONLY USED FOR CONSTRUCTING LARGE FORMAT NEAR AND MID INFRARED FPAS BUT HAS NEVER BEEN IMPLEMENTED ON SUCH A SCALE FOR FABRICATING FAR INFRARED FPAS. THE DETECTOR MATERIAL AND THE READOUT ARE BUMP BONDED FACE-TO-FACE AND ARE IN INTIMATE CONTACT AND THE ASSEMBLY IS SUPPORTED BY A SUBSTRATE MADE OF ALUMINA OR OTHER SUITABLE MATERIAL.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.