Federal Awards · Award

SBIR PHASE III FOR HEAT PIPE LIFE TEST. THERMACORE SHALL CONTINUE LIFE TESTING OF THE 1/10 SEGMENT STIRLING…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
NNC07QA95P
Contractor
Sub-agency / office
National Aeronautics and Space Administration
Award amount
$0
Period of performance
Feb 15, 2007 – Feb 21, 2008
NAICS
541710
PSC
PSC AR11
Place of performance
PA

Public award description

SBIR PHASE III FOR HEAT PIPE LIFE TEST. THERMACORE SHALL CONTINUE LIFE TESTING OF THE 1/10 SEGMENT STIRLING CONVERTOR HEAT PIPE. THERMACORE SHALL PROVIDE BRIEF MONTHLY EMAIL STATUS REPORTS TO STEVEN GENG (STEVEN.M.GENG@NASA.GOV). THESE STATUS REPORTS SHALL INCLUDE HOURS OF OPERATION AND A BRIEF DISCUSSION CONCERNING ANY PROBLEMS ENCOUNTERED. AT THE CONCLUSION OF THE PURCHASE ORDER, THERMACORE SHALL PROVIDE A TEST REPORT TO NASA GLENN RESEARCH CENTER (GRC) THAT DESCRIBES THE LIFETIME TESTING OF THE UNCOATED 1/10 SEGMENT STIRLING CONVERTOR HEAT PIPE AND THE RESULTS AND ANALYSES OF THAT TESTING. THE REPORT SHALL INCLUDE HOURS OF OPERATION, REPRESENTATIVE TEMPERATURES AND HEAT FLOW RATES, AND A DISCUSSION OF ANY PROBLEMS ENCOUNTERED. NASA-GRC SHALL HAVE UNLIMITED RIGHTS TO THIS TEST REPORT. THE TEST REPORT SHALL BE DELIVERED TO STEVEN GENG (MAIL STOP 301-2). AT THE END OF ALL PLANNED TESTING (10 YR GOAL OR UNTIL FAILURE), THERMACORE SHALL REMOVE THE SODIUM WORKING FLUID AND THEN SECTION AND ANALYZE THE HEAT PIPE TO OBTAIN THE FINAL RESULTS OF THE LIFETIME TESTING. THE HEAT PIPE WILL NEED TO BE CUT UP AT THE END OF TERSTING TO DETERMINE THE RESULTS OF THE TESTS. THERMACORE SHALL PROVIDE A COMPREHENSIVE FINAL TEST REPORT TO NASA GRC THAT DESCRIBES THE LIFETIME TESTING OF THE 1/10 SEGMENT STIRLING CONVERTOR HEAT PIPE AND THE RESULTS AND ANALYSES OF THAT TESTING. THE FINAL REPORT SHALL INCLUDE HOURS OF OPERATION, REPRESENTATIVE TEMPERATURES AND HEAT FLOW RATES, THE REULTS OF THE SECTIONING AND THE POST-TEST ANALYSES OF THE HEAT PIPE, AND A DISCUSSION OF ANY PROBLEMS ENCOUNTERED. NASA GRC SHALL HAVE UNLIMITED RIGHTS TO THIS FINAL TEST REPORT WHICH SHALL BE DELIVERED TO STEVEN GENG (MAIL STOP 301-2). THERMACORE SHALL DISPOSE OF THE HEAT PIPE AND SHALL SUBMIT A LETTER TO THE GRC, ON COMPANY LETTERHEAD, STATING IN WHAT MANNER THE HEAT PIPE WAS DESTROYED AND HOW THE RESIDUE WAS DISPOSED OF. THE LETTER SHALL BE SIGNED BY THE PERSON WHO PERFORMED THE DESTRUCTION OF THE HEAT PIPE.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.