Federal Awards · Award

UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING EFFORTS: SCHEDULE INPUTS TO THE MAVEN NGIMS…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
NNG10PH02C
Contractor
Sub-agency / office
National Aeronautics and Space Administration
Award amount
$0
Period of performance
Jul 27, 2010 – Aug 31, 2012
NAICS
541330 — Engineering Services
PSC
PSC C215
Place of performance
FL

Public award description

UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING EFFORTS: SCHEDULE INPUTS TO THE MAVEN NGIMS SCHEDULER MONTHLY. REVIEW, PROVIDE COMMENTS AND BE COMPLIANT, WHERE APPROPRIATE, TO THE NGIMS SYSTEM SAFETY PLAN AND WILL BE IN COMPLIANCE WITH NASA NPR 6000.IG. REPORT TECHNICAL PROGRESS ON THE QMS, RF MEB, DETECTOR AND STRUCTURE MECHANICAL DESIGNS AND ANALYSES. SUPPORT PROGRAMMATIC AND TECHNICAL MEETING VIA TELECONS. REVIEW AND PROVIDE INPUTS ON THE QMS , RF , MEB, DETECTOR AND STRUCTURE MECHANICAL DESIGNS TO THE NGIMS PROJECT ELEMENT LEADS. SUBMIT NGIMS MECHANICAL DESIGN PACKAGES IN ELECTRONIC FORM FOR THE NGIMS PRELIMINARY DESIGN REVIEW (I-PDR) AND CRITICAL DESIGN REVIEW (I-CDR). ATTEND THE REVIEWS AND PRESENT MATERIAL AS DEEMED NECESSARY. SUPPORT THE NGIMS PRE ENVIRONMENTAL REVIEW (PER), NGIMS PRE SHIP REVIEW (PSR), AND THE PRE LAUNCH READINESS REVIEW (LRR) IF REQUIRED. SUPPORT AND ATTEND ALL NGIMS PEER REVIEWS REQUIRING MECHANICAL SUPPORT. REVIEW AND PROVIDE INPUTS TO THE NGIMS FAILURE MODES AND EFFECTS ANALYSIS (FMEA) REPORTS, SUPPORTING A SYSTEM LEVEL FMEA STARTING EARLY IN THE DESIGN PHASE TO ENSURE THAT ANY DESIGN CHANGES RESULTING FROM REVIEWS, ETC. DO NOT INTRODUCE NEW FAILURE MODES OR HIGHER-LEVEL CRITICAL FAILURE MODES INTO THE NGIMS SYSTEM. PROVIDE INPUTS TO THE NGIMS QMS SPECIFICATION, THE MECHANICAL QMS SPECIFICATION, THE NGIMS QMS INTERFACE CONTROL DOCUMENT AND THE MECHANICAL SYSTEMS INTERFACE CONTROL DOCUMENT. DEVELOP AND PROVIDE AN ACCEPTANCE DATA PACKAGE (ADP) FOR THE NGIMS MECHANICAL DESIGNS. DESIGN AND PROVIDE DRAWING PACKAGES FOR THE QMS, RF MODULE, MEB FRAMES, DETECTOR MODULE, MECHANICAL STRUCTURES NECESSARY TO ACCOMMODATE THESE ITEMS INTO THE COMPLETE NGIMS STRUCTURAL ASSEMBLY, AND REQUIRED MGSE. DESIGN AND PROVIDE A DRAWING PACKAGE FOR THE QMS INFLIGHT CALIBRATION MANIFOLD AND GAS INLET TRANSFER LINE. GENERATE ASSEMBLY DRAWINGS AND PROCEDURES FOR THE QMS, MECHANICAL STRUCTURE, RF, DETECTOR, THE MAIN ELECTRONICS BOX AND THE COMPLETE NGIMS INSTRUMENT ASSEMBLY. THE CONTRACTOR WILL ASSIST THE NGIMS LEAD MECHANICAL ENGINEER WITH THE DEVELOPMENT OF A FABRICATION PLAN.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.