TASK TITLE: NEXTGEN AIRPORT MODELING&PORTFOLIO SUPPORT: THE SCOPE OF THIS TASK ORDER IS TO DEVELOP AN UPDAT…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- NNH12CE64T
- Contractor
- Awarding agency
- National Aeronautics and Space Administration
- Sub-agency / office
- National Aeronautics and Space Administration
- Award amount
- $195,233
- Period of performance
- Sep 17, 2019 – Oct 17, 2013
- NAICS
- 541712 — Research and Development in the Physical, Engineering, and Life Sciences
- PSC
- PSC AR11
- Place of performance
- CA
- Parent award
- NNL10AA05B
Public award description
TASK TITLE: NEXTGEN AIRPORT MODELING&PORTFOLIO SUPPORT: THE SCOPE OF THIS TASK ORDER IS TO DEVELOP AN UPDATED AIRPORT CAPACITY MODEL FOR NASA ARMD THAT WILL BE AN INTEGRAL PART OF THE OVERALL STRATEGIC PORTFOLIO ANALYSIS SYSTEM FOR THE NEXTGEN. THE OBJECTIVES OF THIS TASK ORDER ARE: THE MODEL WILL REFLECT THE BASELINE OPERATIONS OF THE NAS WITHOUT NEW TECHNOLOGY IMPLEMENTATIONS. THE MODEL WILL ADJUST AIRPORT CAPACITIES BASED ON EXISTING MASTER PLANS, ADVANCED AIRCRAFT PERFORMANCE, WEATHER CONDITIONS, NOISE AND LOCAL AIR QUALITY CONSTRAINTS AND ATM SYSTEMS AS SPECIFIED IN THE JPDO AND NASA ENTERPRISE ARCHITECTURES AND PORTFOLIO OPTIONS. THE MODEL WILL GENERATE OPERATIONAL PERFORMANCE PARAMETERS TO BE USED BY THE SYSTEM MODELS AS PART OF THE PROCESS FOR GENERATING A FULL SCALE, END-TO-END SIMULATION RUNS FOR THE STRATEGIC PORTFOLIO ANALYSIS. THE CONTRACTOR SHALL PERFORM THE FOLLOWING TASKS: AIRPORT CAPACITY MODEL DEVELOPMENT&ANALYSIS; MODEL/ASSUMPTION VALIDATIONS; VALIDATE AIRPORT MODELS&ENTERPRISE ARCHITECTURE ASSUMPTIONS; UPDATED AIRPORT CAPACITY RESULTS; INTEGRATED FINANCIAL MODEL (IFM) AND RISK MANAGEMENT SUPPORT; INTEGRATED FINANCIAL MODEL AVIONICS&EQUIPAGE INPUTS. THE CONTRACTOR SHALL DELIVER INTEGRATED FINANCIAL MODEL OPERATIONAL PERFORMANCE&CONSTRAINTS INPUTS; LESSONS LEARNED UPDATES; IPSA PORTFOLIO REPORT AND BRIEFING PACKAGE; IPSA PORTFOLIO REPORT ASSUMPTIONS UPDATES; AND COMMENTS AND FINDINGS TO THE IPSA PORTFOLIO REPORT&BRIEFING. THE CONTRACTOR SHALL BE REQUIRED TO PARTICIPATE IN AND/OR TRAVEL TO THE PLANNED PRESENTATIONS, MEETINGS AND TELECON. KICK-OFF PRESENTATION: THE CONTRACTOR SHALL PREPARE A PRESENTATION IN POWERPOINT THAT FACILITATES REVIEW AND DISCUSSION OF THE PROJECT OBJECTIVES, APPROACH (I.E., ANTICIPATED PROJECT SCHEDULE, MILESTONES, DELIVERABLES), AND THE DESIRED OUTCOMES AND TANGIBLE PRODUCTS. MODEL BUILD&DATA RESULTS MEETINGS, THE CONTRACTOR SHALL: VERBALLY PARTICIPATE IN MEETINGS AND DISCUSS CURRENT MODEL ASSUMPTIONS, MODEL PARAMETER SETTINGS, MAPPINGS TO ARCHITECTURE COMPONENTS, PROXY PROGRAMS, SCENARIOS/ALTERNATIVES AND ANY INTERMEDIATE TEST RESULTS THAT ARE AVAILABLE. THE CONTRACTOR SHALL PROVIDE MONTHLY TECHNICAL PROGRESS REPORTS FOR EACH TASK ORDER; AND SUBMIT A FORMAL FINAL REPORT AS REQUIRED.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.