Federal Awards · Award

HIGH FIDELITY SUPERSONIC EXHAUST SYSTEM DESIGN AND VALIDATION MODEL SCOPE OF WORK THIS SOW COVERS THE MECHA…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
NNL08AA29C
Contractor
Sub-agency / office
National Aeronautics and Space Administration
Award amount
$0
Period of performance
Aug 11, 2008 – Dec 31, 2008
NAICS
541712 — Research and Development in the Physical, Engineering, and Life Sciences
PSC
PSC AR11
Place of performance
IN

Public award description

HIGH FIDELITY SUPERSONIC EXHAUST SYSTEM DESIGN AND VALIDATION MODEL SCOPE OF WORK THIS SOW COVERS THE MECHANICAL DESIGN (BASE PERIOD), BASED ON COMPUTATIONAL FLUID DYNAMIC (CFD) ANALYSIS, AND THE MANUFACTURE (OPTION PERIOD) OF A HIGHLY VARIABLE CYCLE (HVC) EXHAUST SYSTEM VALIDATION MODEL THAT WILL ADAPT TO THE HIGH FLOW JET EXIT RIG (HFJER) IN THE AERO-ACOUSTIC PROPULSION LABORATORY (AAPL) AT NASA GLENN RESEARCH CENTER. FABRICATION (OPTION PERIOD) IS CONDITIONAL UPON A SATISFACTORY CRITICAL DESIGN REVIEW (CDR) AND AN ACCEPTABLE HARDWARE COST ESTIMATE. THE NEW HVC EXHAUST SYSTEM MODEL INCORPORATES COMPONENTS THAT WERE REDESIGNED AFTER ANALYSIS OF RESULTS OBTAINED FROM EXPERIMENTS CONDUCTED WITH SUPERSONIC BUSINESS JET (SSBJ) EXHAUST SYSTEM IN 2003. TASKS/TECHNICAL REQUIREMENTS: WBS 1.0 - DELIVER COMPUTATIONAL FLUID DYNAMIC ANALYSIS RESULTS FOR HVC EXHAUST MODEL. THE CONTRACTOR SHALL DELIVER COMPUTATIONAL FLUID DYNAMIC ANALYSIS RESULTS FOR THE PROPOSED HVC. THE ANALYSIS SHALL INCLUDE STEADY STATE FLOW QUANTITIES AND PREDICTED PERFORMANCE AT THE DESIGN POINT, A SEA LEVEL TAKE-OFF POINT, AND A CRUISE POINT AT 50,000 FT ALTITUDE AND A MACH NUMBER OF 1.8. WBS 2.0 - DELIVER REPRESENTATIVE MODEL CYCLE LINES INCLUDING OPERATING PRESSURES AND TEMPERATURES. THE CONTRACTOR SHALL DELIVER REPRESENTATIVE MODEL CYCLE LINES INCLUDING OPERATING PRESSURES AND TEMPERATURES. WBS 3.0 - DEFINE, DIRECT, AND COMPLETE THE DETAILED MECHANICAL DESIGN FOR HVC EXHAUST SYSTEM MODEL. THE CONTRACTOR SHALL DEVELOP A DETAILED DESIGN FOR THE HVC EXHAUST MODEL SHOWN IN FIGURE 1 USING ELECTRONIC SURFACE MODELS FROM THE AERO-DESIGNS AS IGES FILES. THE MODEL SHALL ADAPT TO THE HFJER WITHIN THE AAPL AT NASA GLENN RESEARCH CENTER. THE RIG INTERFACE POINTS FOR THE MODEL SHALL BE THE CHARGING STATION FAN DUCT (NASA DRAWING CE-645707), THE CHARGING STATION CORE DUCT (NASA DRAWING CE-645708), AND THE CORE TAILCONE WELDMENT (NASA DRAWING CF-645686). THE MODEL SHALL INCLUDE AN EXHAUST TAILCONE, A TRANSLATING FORCED LOBE MIXER WITH MANUAL AXIAL SETTINGS, A VARIABLE PRIMARY NOZZLE THROAT SECTION FOR SEA LEVEL TAKE-OFF SETTINGS, AND A VARIABLE SECONDARY NOZZLE WITH REMOTELY ACTUATE CLAM SHELL DOORS. MODEL COMPONENTS SHALL ADHERE TO REQUIREMENTS SPECIFIED (IN OTHER DOCUMENTS PROVIDED). THE CONTRACTOR SHALL PERFORM THE FOLLOWING SPECIFIC TASK ELEMENTS: 3.1 IDENTIFY MODEL WORKING RANGE INCLUDING ALLOWABLE OPERATING PRESSURES AND TEMPERATURES 3.2 PREPARE A GEOMETRY DATA PACKAGE 3.3 DEFINE INSTRUMENTATION TO PROVIDE FOR ADEQUATE COMPUTATIONAL FLUID DYNAMICS AERODYNAMICS COMPARISONS (PRELIMINARY ESTIMATES ASSUME 10 TEMPERATURES AND 100 PRESSURE PROBES). 3.4 PREPARE A REQUIREMENTS DOCUMENT DEFINING TEST OPERATING CONDITIONS AND VARIABLES DEPLOYMENT 3.5 CONDUCT A PRELIMINARY DESIGN REVIEW (PDR) AT NASA GLENN RESEARCH CENTER 3.6 DEVELOP A DETAILED MECHANICAL DESIGN FOR THE MODEL NOZZLE AND LOCATE TEST INSTRUMENTATION ON THE TEST MODEL. 3.7 CDR AT NASA GLENN RESEARCH CENTER 3.8 DELIVER STRESS REPORT OF CALCULATIONS DEMONSTRATING SAFETY FACTORS AT THE OPERATING CONDITIONS DEFINED FOR PERFORMANCE OF WBS 2.0 AND AT MAXIMUM ALLOWABLE MODEL TEMPERATURES AND PRESSURES. 3.9 DELIVER COST ESTIMATE FOR HVC EXHAUST MODEL. WBS 4.0 - DELIVER REPORTS AND PRESENTATIONS. 4.1 THE CONTRACTOR SHALL DELIVER MONTHLY TECHNICAL REPORTS 4.2 THE CONTRACTOR SHALL DELIVER A FINAL PRESENTATION 4.3 THE CONTRACTOR SHALL DELIVER A FINAL REPORT OPTION 1 (FABRICATION): IF OPTION 1 IS EXERCISED, THE FOLLOWING TASKS SHALL BE COMPLETED: WBS 5.0 - FABRICATE THE HVC SUPERSONIC EXHAUST NOZZLE MODEL. THE CONTRACTOR SHALL FABRICATE THE HVC EXHAUST NOZZLE MODEL AS SPECIFIED BY THE REQUIREMENTS DOCUMENT DEVELOPED DURING PERFORMANCE OF WBS 3.0. THE CONTRACTOR SHALL PERFORM THE FOLLOWING SPECIFIC TASK ELEMENTS: 5.1 FABRICATE PARTS FOR THE HVC EXHAUST NOZZLE MODEL 5.2 TRIAL FIT MODEL PARTS, TRIM, ASSEMBLE, AND INSTALL TEST INSTRUMENTATION 5.3

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.