INTRODUCTION/BACKGROUND: THE TESTING DESCRIBED BY THE STATEMENT OF WORK (SOW) IS IN SUPPORT OF A RISK ASSES…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- NNL08AB72P
- Contractor
- Awarding agency
- National Aeronautics and Space Administration
- Sub-agency / office
- National Aeronautics and Space Administration
- Award amount
- $0
- Period of performance
- Feb 14, 2008 – Feb 22, 2008
- NAICS
- 541380 — Testing Laboratories and Services
- PSC
- PSC AR11
- Place of performance
- WA
Public award description
INTRODUCTION/BACKGROUND: THE TESTING DESCRIBED BY THE STATEMENT OF WORK (SOW) IS IN SUPPORT OF A RISK ASSESSMENT COMMISSIONED BY THE NASA ENGINEERING AND SAFETY CENTER (NESC). THE DESCRIBED FAILURE ANALYSES SHALL BE PERFORMED ON A METEOROID IMPACT SITE IN A HARNESS. THIS DEVICE TYPE IS USED IN THE JAMES WEBB SPACE TELESCOPE. TESTING SHALL BE PERFORMED IN A MANNER SIMILAR TO THAT PERFORMED IN LATE 2006 AND EARLY 2007 FOR THE SSPTS PROJECT AT JSC BY THE CONTRACTOR. DESCRIPTION OF TASKS TO BE PERFORMED: THE CONTRACTOR SHALL PROVIDE THE NECESSARY MANPOWER AND EXPERTISE TO PERFORM THE FOLLOWING: THERE ARE UP TO 8 DAMAGE SITES CREATED BY INDIVIDUAL HYPERVELOCITY METEOROID IMPACTS ON HARNESS SEGMENTS TO BE INSPECTED AND ANALYZED FOR DAMAGE. THE CONTRACTOR SHALL PROVIDE THE FOLLOWING INFORMATION: 1. THE CONDITION OF THE SHIELD AND THE SHIELD RELATIVE DISTANCE TO EXPOSED WIRES. (QUANTIFY THE THREAT OF SHIELD SHORTING TO WIRE) 2. THE CONDITION OF THE WIRE, (QUANTIFY THE RISK OF SEVERED WIRE) 3. PHOTOGRAPH THE IMPACT SITE DAMAGE AT VARIOUS STAGES OF DISASSEMBLY FOR THE CRYOGENICALLY COOLED HARNESS SEGMENTS, THE CONTRACTOR SHALL PROVIDE THE FOLLOWING INFORMATION: 1. ARE THERE CRACKS OR OTHER EVIDENCE OF ADDITIONAL DAMAGE OR DIFFERENT DAMAGE RELATIVE TO THE WARM IMPACT SITES. (QUANTIFY THREAT DIFFERENCE OF CRYOGENIC IMPACTS RELATIVE TO WARM IMPACTS) DELIVERABLES: FAILURE ANALYSIS REPORTS FOR THE METEOROID IMPACT SITE IN THE HARNESS, DUE NO LATER THAN FEBRUARY 21, 2008 OR TWO WEEKS AFTER RECEIPT OF THE HARNESS FOR TESTING. DELIVERABLES ADDRESS: THE DELIVERABLES SHALL BE SENT VIA EMAIL TO THE FOLLOWING. COMPATIBILITY/READABILITY ISSUES SHALL BE WORKED OUT IN ADVANCE BY BOTH PARTIES (I.E., THE CONTRACTOR AND THE GOVERNMENT). MITCHELL DAVIS 301-286-4114 MITCHELL.L.DAVIS@NASA.GOV PERIOD OF PERFORMANCE: PERIOD OF PERFORMANCE SHALL BE 2 WEEKS, COMMENCING UPON THE RECEIPT OF THE TEST ARTICLES ON FEBRUARY 7, 2008 AND COMPLETING ON FEBRUARY 22, 2008 WITH THE DELIVERY OF THE FAILURE ANALYSIS REPORT. ITEMS TO BE FURNISHED BY GOVERNMENT: THE HARNESS WITH A METEOROID IMPACT SITE WILL BE PROVIDED. THIS HARNESS WILL BE SHIPPED TO HI-REL LABORATORIES IN ELECTROSTATIC PROTECTIVE PACKAGING IMMEDIATELY UPON AWARD OF THE PURCHASE ORDER. THIS HARNESS SHALL BE RETURNED TO THE GOVERNMENT UPON COMPLETION OF THE TESTING.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.