Federal Awards · Award

IGF::OT::IGF SBIR PHASE III DEVELOPMENT OF THE REPRESENTATIVE JET MODEL AREA-I HAS COMPLETED A PHASE-I SBIR…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
NNL13AA72P
Contractor
Sub-agency / office
National Aeronautics and Space Administration
Award amount
$0
Period of performance
Jan 10, 2013 – Jul 10, 2013
NAICS
541712 — Research and Development in the Physical, Engineering, and Life Sciences
Place of performance
GA

Public award description

IGF::OT::IGF SBIR PHASE III DEVELOPMENT OF THE REPRESENTATIVE JET MODEL AREA-I HAS COMPLETED A PHASE-I SBIR THAT EXAMINED THE DESIGN TRADES AND BASIC SIZING REQUIREMENTS OF A MODULAR DYNAMICALLY SCALED AIRCRAFT MODEL. THE FEASIBILITY OF A 16.5% SCALE REGIONAL JET MODEL (RJM) WAS ESTABLISHED, INCLUDING REQUIREMENTS FOR AERODYNAMIC, STRUCTURAL AND PROPULSION SYSTEMS. THE SCOPE OF THIS PHASE-III EFFORT IS TO FINALIZE THE VEHICLE S DESIGN PARAMETERS AND ALSO TO ACCOMMODATE A BASELINE SET OF AVIONICS AND INSTRUMENTATION AS OUTLINED IN THE TASKS BELOW. TASK 1: FINALIZE WING GEOMETRY AND MASS PROPERTIES DURING THIS TASK, AREA-I PERSONNEL SHALL MEET WITH THE NASA CUSTOMER AND CONDUCT PRELIMINARY AND FINAL DESIGN REVIEWS WHEREIN THE GEOMETRIC AND PERFORMANCE DETAILS OF THE FINAL RJM AIRCRAFT ARE SPECIFIED. SPECIFICALLY, WING PLANFORM AND WING TWIST PARAMETERS THAT WERE APPROXIMATED IN THE PHASE-I STUDY WILL BE FINALIZED. THESE CHANGES SHALL BE PROPAGATED TO THE DETAILED CAD MODEL, AND ANY STRUCTURAL OR MANUFACTURING EFFECTS CONSIDERED. THE NOMINAL AND BALLASTED MASS AND INERTIA PROPERTIES SHALL ALSO BE REVIEWED UNDER THIS TASK. AS THESE DESIGN DETAILS ARE REFINED, AREA-I SHALL UTILIZE MODELS GENERATED DURING THE PHASE I TO ENSURE THAT THE SPECIFIED RJM DESIGN DOESN T CREATE A FABRICATION OR STRUCTURAL ASSEMBLY ISSUE. TASK 2: ESTABLISH BASELINE FOR AVIONICS AND INSTRUMENTATION FOR EXPERIMENTAL RESEARCH, THE AIRCRAFT SHALL BE EQUIPPED WITH AN AVIONICS AND TELEMETRY SYSTEM, AS WELL AS INSTRUMENTATION SYSTEMS. DETAILS OF THE SIZE, WEIGHT, AND REQUIRED POWER/SIGNAL CABLING WILL BE PROVIDED TO AREA-I BY THE GOVERNMENT IN ORDER TO CONDUCT THIS TASK. AREA-I SHALL COMPLETE ANALYSIS TO ENSURE WEIGHT AND BALANCE CAN BE MAINTAINED. AREA-I SHALL DESIGN AN INTERIOR MOUNT SYSTEM TO ACCOMMODATE INSTALLATION AND WIRING NEEDS IMPOSED BY THE AVIONICS. THIS DESIGN OF THE EQUIPMENT SHALL INCLUDE, BUT IS NOT LIMITED TO, THE FOLLOWING: ANTENNA TYPES AND PLACEMENTS POWER SYSTEM SIZING AND PLACEMENT FUEL CAPACITY (FLIGHT ENDURANCE, EMPTY AND GROSS WEIGHTS) SENSOR PLACEMENT (AIR DATA PROBE, IMU, GPS, POTENTIOMETERS, ETC.) CONTROL SURFACE TYPES AND DEFLECTIONS FLIGHT COMPUTER SYSTEM

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.