Federal Awards · Award

IGF::OT::IGF "OPTIMIZATION OF SANSEC SMART SKIN DESIGN" THE CONTRACTOR SHALL PERFORM THE FOLLOWING TASK REQ…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
NNL14AB32T
Contractor
Sub-agency / office
National Aeronautics and Space Administration
Award amount
$220,508
Period of performance
Jul 11, 2014 – Aug 31, 2016
NAICS
541712 — Research and Development in the Physical, Engineering, and Life Sciences
PSC
PSC AR11
Place of performance
VA
Parent award
NNL13AA08B

Public award description

IGF::OT::IGF "OPTIMIZATION OF SANSEC SMART SKIN DESIGN" THE CONTRACTOR SHALL PERFORM THE FOLLOWING TASK REQUIREMENTS: 1.1. ADDRESS THE CHARACTERIZATION OF SANSEC SENSOR DESIGN AND OPTIMIZATION FOR OPERATION ON CARBON COMPOSITES 1.1.1. SUPPORT A SYSTEMATIC CEM PARAMETRIC TRADE STUDY TO INVESTIGATE SQUARE PLANAR SANSEC SENSOR GEOMETRIES ON CFRP SUBSTRATES TO ESTABLISH TRENDS IN THE OPERATIONAL DAMAGE DETECTION ENVELOP WHICH POINT TOWARD MAXIMUM ACHIEVABLE PERFORMANCE DESIGNS FOR OPERATION. 1.1.2. PROVIDE SUPPORT IN DETERMINING THE MAXIMUM ACHIEVABLE DAMAGE DETECTION THRESHOLD FIDELITY AND ASSESS IF ANY OPTIMIZED DESIGNS ARE CAPABLE OF DETECTING GIVEN FAULT TYPE SCENARIOS 1.2. EVALUATE SANSEC SENSOR LIGHTNING ATTACHMENT CHARACTERISTICS 1.2.1. CONDUCT AN EXPLORATORY CEM STUDY TO MODEL SANSEC SENSOR DESIGNS COVERING A REGION OF AN AIRCRAFT SURFACE TO DETERMINE IF A LIGHTNING LEADER ATTACHMENT CAN BE MANIPULATED FROM THE SENSORS ACTIVE CONTRIBUTIONS TO SYSTEMATICALLY ESTABLISH THE CONDITION FOR THE ELECTRICAL BREAKDOWN OF AIR TO OCCUR ON THE SENSOR TRACE OR FROM THE SELF-GENERATED LORENTZ FORCE ACTING ON THE INCOMING LEADER. 1.2.2. DELIVER A REPORT WHICH INCLUDES CEM DATA RESULTS AND ANALYSIS WHICH INDICATE THE CONTRACTOR S VIEWPOINT AS TO THE POTENTIAL FEASIBILITY OF USING SANSEC SENSORS TO MANIPULATE LIGHTING ATTACHMENT. 1.3. FABRICATE AND TEST SANSEC LSP DESIGNS WITH ZONE 2B LIGHTNING WAVEFORM. 1.3.1. FABRICATE A MINIMUM OF TWELVE (12) SANSEC CFRP LIGHTNING TEST PANELS IN ACCORDANCE TO SPECIFICATIONS 1.3.2. PERFORM A QUALITY ASSURANCE EVALUATION ON THE FABRICATED SANSEC LSP TEST PANELS 1.3.3. CONDUCT HIGH CURRENT LIGHTNING TESTS ON AT LEAST TWELVE (12) SANSEC LSP CFRP TEST PANELS 1.3.4. PERFORM NONDESTRUCTIVE EVALUATIONS ON TWELVE (12) LSP COMPOSITE TEST PANELS 1.3.5. PERFORM DAMAGE ASSESSMENTS ON TWELVE (12) LIGHTNING STRUCK COMPOSITE TEST PANELS FOLLOWING THE TEST PROCEDURES DEFINED WITHIN DOCUMENT NUMBER: DOC-128697 TITLED LSP COMPOSITE SUBSTRATE DESTRUCTIVE EVALUATION TEST [8]. IF AN ALTERNATE CFRP SUBSTRATE WAS USED IN THE FABRICATION OF THE TEST PANELS, 3 BASELINE PROTECTED TEST PANELS SHALL ALSO UNDERGO THE SAME DAMAGE ASSESSMENT.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.