IGF::OT::IGF SCIENCE MISSION STUDIES CONDUCTED BY THE ROBOTIC LUNAR LANDER (RLL) DEVELOPMENT PROJECT AT MSF…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- NNM13AA33C
- Contractor
- AEROJET ROCKETDYNE OF DE, INC
- Awarding agency
- National Aeronautics and Space Administration
- Sub-agency / office
- National Aeronautics and Space Administration
- Award amount
- $1,880,564
- Period of performance
- Dec 15, 2017 – Mar 14, 2018
- NAICS
- 336415 — Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing
- PSC
- PSC AR15
Public award description
IGF::OT::IGF SCIENCE MISSION STUDIES CONDUCTED BY THE ROBOTIC LUNAR LANDER (RLL) DEVELOPMENT PROJECT AT MSFC INDICATE THAT THE SPACECRAFT PROPULSION SYSTEM USED FOR THE MISSIONS MUST BE HIGH PERFORMANCE, LIGHTWEIGHT, AND COMPACT. HIGHLY MATURED TECHNOLOGY, LOW COST, AND SHORT DEVELOPMENT TIME ON THE PROPULSION SYSTEM ARE ALSO CRITICALLY DESIRABLE. SUBSEQUENTLY, THRUSTERS, BEING MAJOR PROPULSION COMPONENTS, HAVE BEEN IDENTIFIED AS HIGH RISK AND LONG-LEAD ITEMS FOR THE PROPULSION DEVELOPMENT. NASA MSFC FOR THE PAST SEVERAL YEARS HAS EVALUATED AVAILABLE OPERATIONAL MISSILE DEFENSE AGENCY (MDA) HERITAGE THRUSTERS SUITABLE FOR THE RLL PROPULSION SYSTEMS. HOT-FIRE TESTS OF 5-LBF AND 100-LBF THRUST-CLASS THRUSTERS DEMONSTRATED THAT THE MDA HERITAGE HARDWARE CAN BE IMPROVED TO MEET THE PROPULSION SYSTEM DEVELOPMENT OBJECTIVES: 1) LIGHTWEIGHT ON THRUSTER COMPONENTS AS WELL AS ON THE OVERALL SYSTEM; 2) LOW UNIT COST (IN COMPARISON WITH CONVENTIONAL THRUSTERS; 3) OPERATION OVER THE PROJECTED MISSION FLIGHT PROFILES, TOTAL BURN TIMES, AND ENTIRE MISSION DURATION; AND, 4) OPERATION WITH COLD PROPELLANTS (MON-25/MMH) FOR MINIMIZING THE HEATER POWER REQUIREMENT AND IN SPACE ENVIRONMENTS. FOR THIS NEXT YEAR NASA PLANS TO FOCUS ON THE MATURATION OF THE 100-LBF CLASS THRUSTER. STARTING FROM THE CURRENT TECHNOLOGY LEVEL, THE 100-LBF CLASS THRUSTER WILL BE EVOLVED THROUGH THE COMPLETION OF THE DESIGN VERIFICATION TEST PHASE. THE ENTIRE THRUSTER DEVELOPMENT IS EXPECTED TO COMPLETE WITHIN TWELVE MONTHS. THE REQUESTED EFFORT WILL BE DIVIDED INTO TWO WORK PERIODS (BASE AND OPTION PERIODS). THE BASE PERIOD IS PRIMARILY TO MAKE THE THRUSTER HARDWARE AND ASSOCIATED TEST SUPPORT COMPONENTS READY FOR HOT FIRE TESTS. THE WORK IN THIS PERIOD SHALL INCLUDE ALL HARDWARE DESIGN, FABRICATION, AND INTEGRATION OF THE TWO THRUSTER UNITS. THE DESIGN AND FABRICATION OF ALL HARDWARE TEST SUPPORT COMPONENTS SHALL BE ALSO PERFORMED. THE CONTRACTOR SHALL DESIGN THE THRUSTER TO MEET THE THRUSTER REQUIREMENTS SPECIFIED IN THE REFERENCED REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DELIVER TWO INTEGRATED VALVE AND INJECTOR COMPONENTS AND PROVIDE ENGINEERING SUPPORT FOR COLD FLOW COMPONENT TESTING AT THE FACILITY SPECIFIED BY NASA. AFTER CONDUCTING THE COLD FLOW TESTING, THE VALVE AND INJECTOR COMPONENTS WOULD THEN BE RETURNED TO THE CONTRACTOR FOR THE FINAL THRUSTER ASSEMBLY. AT THE END OF THIS WORK PHASE. THE CONTRACTOR SHALL DELIVER TO NASA TWO ASSEMBLED THRUSTER UNITS, ALL ASSOCIATED INSTRUMENTATION AND TEST SETUP COMPONENTS READY FOR CONDUCTING DESIGN VERIFICATION TESTS. NASA WILL CHOOSE TO EXERCISE AN OPTION PERIOD BASED ON THE WORK PROGRESS OF THE BASE PERIOD AND FUNDING AVAILABILITY. THE OPTION PERIOD WILL EMPHASIZE ON THE DESIGN VERIFICATION HOT-FIRE TEST OF THE THRUSTER. TO ENSURE THE WORK IS ON SCHEDULE, THE OPTION PERIOD CAN BE PROPOSED TO START AT A TECHNICALLY-SOUNDED AND LOGICAL TIME DURING THE BASE PERIOD. THE CONTRACTOR SHALL PROVIDE THE FACILITY AND THE COORDINATION OF TESTING THE THRUSTERS IN VACUUM CONDITIONS WITH RLL MISSION RELEVANT COLD-TEMPERATURE PROPELLANTS. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY ENGINEERING TEST SUPPORT, INCLUDING THE FORMULATION OF THE TEST PLAN, TO PERFORM THE THRUSTER TESTS. THE CONTRACTOR SHALL PROVIDE PROPELLANTS FOR THE TESTS.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.