103 SEGMENT MEMS DEFORMABLE-MIRROR PROCESS DEVELOPMENT IRIS AO WILL EXTEND ITS PROVEN SEGMENTED MEMS DEFORM…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- NNX09CE01P
- Contractor
- Awarding agency
- National Aeronautics and Space Administration
- Sub-agency / office
- National Aeronautics and Space Administration
- Award amount
- $0
- Period of performance
- Jan 22, 2009 – Jul 22, 2009
- NAICS
- 541712 — Research and Development in the Physical, Engineering, and Life Sciences
- PSC
- PSC AR11
- Place of performance
- CA
Public award description
103 SEGMENT MEMS DEFORMABLE-MIRROR PROCESS DEVELOPMENT IRIS AO WILL EXTEND ITS PROVEN SEGMENTED MEMS DEFORMABLE MIRROR ARCHITECTURE TO LARGE ARRAY SIZES REQUIRED FOR HIGH-CONTRAST ASTROPHYSICAL IMAGERS. CURRENT IMPLEMENTATIONS CONSIST OF ARRAYS OF 37 MIRROR SEGMENTS (CURRENTLY AVAILABLE COMMERCIALLY) AND 163 SEGMENT ARRAYS (FIRST PROTOTYPES UNDER TEST). EXISTING THIN-FILM BASED MEMS FABRICATION TECHNIQUES USED BY COMPETITORS TYPICALLY CAN NOT ACHIEVE AN ADEQUATE DEGREE OF OPTICAL FLATNESS AND MAINTAIN IT OVER A RANGE OF TEMPERATURES. EVEN NEWER THICK-FILM METHODS SUFFER FROM THE SAME PROBLEM TO SOME DEGREE. THE IRIS AO SEGMENTED MIRROR APPROACH, ON THE OTHER HAND, USES A THICK AND RIGID SINGLE-CRYSTAL-SILICON OPTICAL SURFACE BONDED TO AN ELECTROSTATICALLY DRIVEN ACTUATOR PLATFORM. THIS RESULTS IN EXCELLENT MIRROR FLATNESS AND INSENSITIVITY TO TEMPERATURE EVEN WHEN SPECIALIZED OPTICAL COATINGS ARE USED. THIS PROPOSAL ADDRESSES SCALING THIS TECHNOLOGY UP TO 10^3 SEGMENTS. KEY TECHNICAL ISSUES TO BE ADDRESSED IN ACCOMMODATING THE LARGER NUMBER OF SEGMENTS INCLUDE: (A) CONTROLLING OVERALL BOW OF THE LARGER CHIP; (B) DEVELOPING THE ELECTRICAL INTERCONNECT DESIGN AND FABRICATION PROCESS, AND (C) MODIFYING THE MIRROR-WAFER BONDING PROCESS. THIS PHASE I WILL INCLUDE ONE PROCESS RUN IN ORDER TO TEST AND REFINE THE PROPOSED SOLUTIONS.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.