DURING THE PHASE I PROGRAM, MARK RESOURCES VERY SUCCESSFULLY DEMONSTRATED THE FEASIBILITY OF USING SEVERAL…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- NNX10CB18C
- Contractor
- Awarding agency
- National Aeronautics and Space Administration
- Sub-agency / office
- National Aeronautics and Space Administration
- Award amount
- $0
- Period of performance
- Sep 9, 2010 – Dec 17, 2011
- NAICS
- 541712 — Research and Development in the Physical, Engineering, and Life Sciences
- PSC
- PSC AR11
- Place of performance
- CA
Public award description
DURING THE PHASE I PROGRAM, MARK RESOURCES VERY SUCCESSFULLY DEMONSTRATED THE FEASIBILITY OF USING SEVERAL DISTRIBUTED SMALL AND SIMPLE FRPAS THAT DO NOT NEED TO BE PRECISELY ARRANGED, TO SUPPRESS WIDEBAND INTERFERENCE AND/OR JAMMING AND TO PROVIDE SUFFICIENTLY ACCURATE AND TIMELY POSITION AND VELOCITY MEASUREMENTS FROM THE C/A CODE FOR LAUNCH VEHICLE RANGE SAFETY, ANTENNA POINTING, AND ATTITUDE DETERMINATION. THE NEW TECHNOLOGY, DEMONSTRATED VIA SOFTWARE SIMULATION, IS COMPATIBLE WITH EXISTING LAUNCH-CAPABLE GPS ANTENNAS AND RECEIVER HARDWARE, AND REQUIRES THE ADDITION OF CABLING AND A COMMON PROCESSOR (AND CAN ACCOMMODATE CHANNEL MISMATCH IN THE RECEIVERS OR ADDED HARDWARE). THE PROCESSING LOAD FOR JAMMER SUPPRESSION IS SMALL, LESS THAN THAT FOR GPS SIGNAL TRACKING. THE PHASE I PROGRAM EMPLOYED SIGNAL SIMULATION AT THE INTERMEDIATE FREQUENCY (IF) OF THE RECEIVERS, AFTER DIGITIZATION. DURING PHASE II, WE PROPOSE TO DEVELOP A DEMONSTRATION UNIT CONSISTING OF LAUNCH-COMPATIBLE ANTENNA AND RECEIVER HARDWARE PLUS PROCESSING SOFTWARE; AND TO MEASURE ITS PERFORMANCE USING A HIGH-FIDELITY RF SIMULATION.
Find out who's winning similar federal contracts