TAS::80 0119::TAS THIS SBIR PHASE II PROPOSAL INTRODUCES A FAST MULTI-MODE HYPERSPECTRAL-MULTISPECTRAL (MM-…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- NNX10RA32C
- Contractor
- Awarding agency
- National Aeronautics and Space Administration
- Sub-agency / office
- National Aeronautics and Space Administration
- Award amount
- $599,990
- Period of performance
- Sep 30, 2009 – Mar 29, 2011
- NAICS
- 541712 — Research and Development in the Physical, Engineering, and Life Sciences
- PSC
- PSC AR11
- Place of performance
- NY
Public award description
TAS::80 0119::TAS THIS SBIR PHASE II PROPOSAL INTRODUCES A FAST MULTI-MODE HYPERSPECTRAL-MULTISPECTRAL (MM-HS-MS) SENSOR WITH PROGRAMMABLE SPECTRAL RESOLUTION. THE SENSOR BRINGS THE FOLLOWING LONG-WAITING BENEFITS TO THE REMOTE SENSOR COMMUNITY: (I) SWITCHABLE BETWEEN HS AND MS OPERATIONS, (II) VARIABLE SPECTRAL RESOLUTION FROM 10NM TO 560 NM; (III) FAST FRAME RATE (54-1,750HZ), (IV) SHORT FULL SPECTRAL RANGE DATA ACQUISITION TIME (10-1-10-2 SEC), (V) INCREASED SENSITIVITY (PARTICULARLY IN MEASURING WEAK OBJECT OR SCENE UNDER LUNAR AND MAN-MADE ILLUMINATION), (VI) IMPROVED SIGNAL-TO-NOISE RATIO (SNR), AND (VII) MORE FLEXIBLE BALANCE BETWEEN THE SPECTRAL IMAGE SCANNING SPEED AND THE DATA STORAGE/PROCESSING FLOW RATE. OTHER FEATURES INCLUDE: LIGHTWEIGHT/COMPACT SIZE, VERSATILE OPERATION ON ORBIT, LOW ORBIT, AND EVEN ON GROUND, AND LOW COST. THE PHASE II OBJECTIVE IS DESIGN, ASSEMBLE, AND TEST THE MM-HS-MS SENSOR PROTOTYPE; EVALUATE PERFORMANCE PROS AND CONS VERSUS THE STATE-OF-THE-ARTS; VERIFY SENSOR PERFORMANCE AGAINST THE NASA MISSION PROGRAM; REACH TRL-6, AND DELIVER THE SENSOR TO NASA.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.