Federal Awards · Award

IN PHASE 1, RIDGETOP GROUP DESIGNED A HIGH-SPEED, YET LOW-POWER SILICON GERMANIUM (SIGE)-BASED, ANALOG-TO-D…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
NNX11CB14C
Contractor
Sub-agency / office
National Aeronautics and Space Administration
Award amount
$0
Period of performance
Sep 27, 2011 – May 31, 2013
NAICS
541712 — Research and Development in the Physical, Engineering, and Life Sciences
PSC
PSC AR11
Place of performance
AZ

Public award description

IN PHASE 1, RIDGETOP GROUP DESIGNED A HIGH-SPEED, YET LOW-POWER SILICON GERMANIUM (SIGE)-BASED, ANALOG-TO-DIGITAL CONVERTER (ADC) TO BE A KEY ELEMENT FOR DIGITAL BEAM FORMING (DBF) SYSTEMS THAT WILL BE USED IN NASA'S FUTURE RADAR APPLICATIONS. THE ADC WILL EMPLOY A NOVEL COMBINATION OF TIME INTERLEAVING, HIGH-SPEED SILICON-GERMANIUM BICMOS TECHNOLOGY AND LOW-POWER TECHNIQUES, SUCH AS THE DOUBLE-SAMPLING TECHNIQUE, PROVIDING EXCEPTIONAL SAMPLING SPEED OF 500 MSPS, 1.5 GHZ ANALOG BANDWIDTH,12 BITS OF RESOLUTION, AND BELOW 500 MW POWER DISSIPATION, EXCEEDING NASA'S REQUIREMENTS. ORDINARILY, ADC DESIGN REQUIRES LARGE TRADE-OFFS IN SPEED, RESOLUTION, AND POWER CONSUMPTION. THE SIGNIFICANCE OF THIS INNOVATION IS THAT IT SIMULTANEOUSLY PROVIDES A HIGH-SPEED, HIGH-RESOLUTION, AND LOW-POWER ADC THAT IS WELL AHEAD OF THE STATE OF THE ART. THESE THREE CHARACTERISTICS ARE NEEDED FOR DBF SYSTEMS THAT CONTAIN LARGE ADC ARRAYS. THE POWER CONSUMPTION OF EXISTING ADC CHIPS PROHIBITS IMPLEMENTATION OF LARGE DBF ARRAYS IN SPACE. RIDGETOP'S INNOVATIVE DESIGN LEVERAGES NEWER SEMICONDUCTOR PROCESS TECHNOLOGIES THAT COMBINE SILICON AND GERMANIUM INTO A COMPOUND SEMICONDUCTOR. RIDGETOP HAS IDENTIFIED TWO PHASE 2 OBJECTIVES, WHICH ARE: 1. DESIGN, FABRICATE AND CHARACTERIZE TEST CHIP 1 THAT CONTAINS CRITICAL ADC SUBCIRCUITS. 2. DESIGN, FABRICATE AND CHARACTERIZE TEST CHIP 2 THAT CONTAINS THE COMPLETE RADIATION TOLERANT, DIGITALLY CALIBRATED, TIME-INTERLEAVED ADC DESIGN. DURING PHASE 1 RIDGETOP IDENTIFIED THE TOPOLOGIES FOR ALL OF THE CIRCUIT BLOCKS THAT WILL BE INCLUDED ON TEST CHIP 1 AND TEST CHIP 2. RIDGETOP HAS ALSO COMPLETED TRANSISTOR-LEVEL DESIGNS FOR THE KEY COMPONENTS ON THESE CHIPS. ESTIMATED TRL AT BEGINNING AND END OF PHASE 2 CONTRACT: BEGIN 4; END 8.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.