Federal Awards · Award

BEAR ENGINEERING PROPOSES TO ADVANCE THE DEVELOPMENT OF AN INNOVATIVE HIGH TORQUE, LOW SPEED, DIRECT DRIVE…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
NNX11CB28C
Contractor
Sub-agency / office
National Aeronautics and Space Administration
Award amount
$0
Period of performance
Jul 26, 2011 – May 31, 2013
NAICS
541712 — Research and Development in the Physical, Engineering, and Life Sciences
PSC
PSC AR11
Place of performance
VA

Public award description

BEAR ENGINEERING PROPOSES TO ADVANCE THE DEVELOPMENT OF AN INNOVATIVE HIGH TORQUE, LOW SPEED, DIRECT DRIVE MOTOR IN ORDER TO MEET NASA'S REQUIREMENTS FOR SUCH DEVICES. FUNDAMENTALLY, ALL ELECTRIC MOTORS BASICALLY WORK ON THE SAME ELECTROMAGNETIC PRINCIPLE: A TANGENTIAL ELECTROMAGNETIC FORCE ATTRACTS THE ROTOR TO THE STATOR. JUST WHEN THE ROTOR FIELD IS CLOSEST TO THE STATOR FIELD AND THE ELECTROMAGNETIC ATTRACTION IS GREATEST, THE POWER IS INTERRUPTED AND ANOTHER SET OF MAGNETIC POLES REPEATS THE CYCLE. FURTHERMORE, THE TWO MAGNETICALLY ATTRACTED ELEMENTS NEVER MAKE CONTACT, WHICH WOULD OTHERWISE OFFER THE HIGHEST FORCE OF ATTRACTION. THE PROPOSED NOVEL MOTOR DESIGN, SUCCESSFULLY DEMONSTRATED AT TRL 4 IN PHASE 1, OPERATES AND BEHAVES ENTIRELY DIFFERENTLY FROM ALL OTHER KNOWN ELECTRIC MOTOR DESIGNS AND IS CAPABLE OF PRODUCING INCREDIBLY HIGH, DIRECT DRIVE TORQUES AT LOW ROTATIONAL SPEEDS. ITS OPERATIONAL PERFORMANCE IS SIMILAR TO THAT OF A STEPPER MOTOR WITH A 1000:1 GEARHEAD ATTACHED, BUT THE SIMILARITY ENDS THERE. THE MOTOR IS CONFIGURED SUCH THAT ITS LENGTH TO DIAMETER ASPECT RATIO IS OPPOSITE THAT OF TRADITIONAL MOTORS AS IT HAS A RELATIVELY LARGE DIAMETER AND SHORT AXIAL LENGTH; THIS OFFERS ALL NEW PACKAGING OPPORTUNITIES. THE DESIGN ALSO ALLOWS FOR A SINGLE, LARGE DIAMETER BEARING PAIR TO BE USED FOR THE MOTOR'S OUTPUT SHAFT WHICH RENDERS IT STIFF ENOUGH TO DIRECTLY MOUNT THE DRIVEN ELEMENTS. THE NEED FOR ADDITIONAL BEARING SUPPORTS AND BEARING MOUNTING STRUCTURE IS THUS ELIMINATED. BY THE END OF PHASE 2, THE SYSTEM WILL BE DESIGNED, DEVELOPED AND TESTED AT TRL 6 WITH MARS ENVIRONMENTAL CONDITIONS.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.