RESEARCH IS PROPOSED TO INVESTIGATE THE FEASIBILITY OF USING ADVANCED MANUFACTURING TECHNIQUES TO ENABLE TH…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- NNX12CD62P
- Contractor
- Awarding agency
- National Aeronautics and Space Administration
- Sub-agency / office
- National Aeronautics and Space Administration
- Award amount
- $0
- Period of performance
- Feb 13, 2012 – Aug 13, 2012
- NAICS
- 541712 — Research and Development in the Physical, Engineering, and Life Sciences
- PSC
- PSC AR11
- Place of performance
- VA
Public award description
RESEARCH IS PROPOSED TO INVESTIGATE THE FEASIBILITY OF USING ADVANCED MANUFACTURING TECHNIQUES TO ENABLE THE AFFORDABLE APPLICATION OF MULTI-FUNCTIONAL HIGH TEMPERATURE COATINGS HAVING ENHANCED RESISTANCE TO HIGH TEMPERATURE ENGINE ENVIRONMENTS. FOR EXAMPLE, THERMAL / ENVIRONMENTAL BARRIER COATINGS (T/EBCS) ARE ENVISIONED TO PROTECT THE SURFACE OF SI-BASED CERAMICS AGAINST MOISTURE-ASSISTED, OXIDATION-INDUCED CERAMIC RECESSION. CURRENT T/EBC SYSTEMS HAVE BEEN DEMONSTRATED IN LONG TIME EXPOSURES AT ~2400?F. HOWEVER, THEIR USE AT ELEVATED TEMPERATURES IS LIMITED BY THE LOW TEMPERATURE STABILITY AND HIGH DIFFUSION ACTIVITY OF CURRENT T/EBC MATERIALS. ONE APPROACH TO ENHANCE THE TEMPERATURE CAPABILITY OF THESE SYSTEMS IS THE INCORPORATION OF MULTI-LAYERED T/EBC DESIGNS TO PROVIDE MULTI-FUNCTIONAL PROTECTION. IN THIS PHASE I EFFORT, NOVEL PROCESSING TECHNIQUES WILL BE DEVELOPED TO ENABLE THE AFFORDABLE, HIGH PERFORMANCE MANUFACTURE OF SUCH SYSTEMS USING A PHYSICAL VAPOR DEPOSITION BASED PROCESSING APPROACH WHICH ENABLES ENHANCED COATING ADHESION AND ADVANCED COATING ARCHITECTURAL, COMPOSITIONAL AND MICROSTRUCTURAL CONTROL. PROCESSING DEVELOPMENTS WILL THEN BE USED TO CREATED NOVEL MULTI-LAYERED COATINGS. THESE COATING LAYERS WILL THEN BE INCORPORATED INTO ADVANCED HIGH TEMPERATURE CAPABLE T/EBC SYSTEMS IN PHASE. THIS WORK WILL LEAD TO THE INCORPORATION OF SI-BASED CERAMIC COMPONENTS INTO ENHANCED EFFICIENCY GAS TURBINE ENGINES TO REDUCE WEIGHT AND INCREASE OPERATING TEMPERATURES. A TRL 4 WILL BE ACHIEVED AT THE END OF PHASE I AND TRL 6 AT THE END OF PHASE II.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.