IGF::OT::IGF - IN THE PROPOSED PHASE II PROGRAM, WE WILL TRANSITION MICROLINK'S 6-INCH EPITAXIAL LIFT-OFF (…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- NNX13CC05C
- Contractor
- Awarding agency
- National Aeronautics and Space Administration
- Sub-agency / office
- National Aeronautics and Space Administration
- Award amount
- $0
- Period of performance
- Jan 16, 2013 – Jan 31, 2015
- NAICS
- 541712 — Research and Development in the Physical, Engineering, and Life Sciences
- PSC
- PSC AR11
- Place of performance
- IL
Public award description
IGF::OT::IGF - IN THE PROPOSED PHASE II PROGRAM, WE WILL TRANSITION MICROLINK'S 6-INCH EPITAXIAL LIFT-OFF (ELO) SOLAR CELL FABRICATION PROCESS INTO A MANUFACTURING PLATFORM CAPABLE OF SUSTAINING LARGE-VOLUME PRODUCTION. KEY PHASE II IMPROVEMENTS IN THE ELO PROCESS ARE REDUCTION IN CYCLE TIME AND INCREASE IN THE YIELD OF LARGE-AREA DEVICES. IN ADDITION, WE WILL TRANSITION ALL CRITICAL DEVICE FABRICATION PROCESSES TO 6-INCH PRODUCTION TOOL SETS THAT ARE DESIGNED FOR VOLUME PRODUCTION, WITH AN EMPHASIS ON AUTOMATED CASSETTE-TO-CASSETTE AND BATCH PROCESSES THAT WILL MINIMIZE OPERATOR DEPENDENCE AND VARIABILITY. DURING THE PHASE II PROGRAM WE WILL ESTABLISH A PILOT PRODUCTION LINE CAPABLE OF AT LEAST 1500 6-INCH WAFERS PER MONTH AT GREATER THAN 80% YIELD. WE WILL ALSO INCREASE THE YIELD AND MANUFACTURABILITY OF THE 6-INCH RECLAIM PROCESS, WHICH IS CRUCIAL TO REDUCING THE COST OF THE CELLS. THIS WILL INVOLVE A CLOSER COLLABORATION WITH OUR SUBSTRATE RECLAIM VENDOR AND THE ESTABLISHMENT OF CLEAR METRICS TO QUALIFY KEY PROCESS VARIABLES IMPACTING DEVICE YIELD. A SUCCESSFUL CONCLUSION OF THIS PHASE II PROGRAM WILL PLACE US IN STRONG POSITION TO SUPPORT POTENTIAL SEP VOLUME SOLAR CELL MANUFACTURING REQUIREMENTS.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.