Federal Awards · Award

IGF::OT::IGF SIERRA LOBO SHALL CONDUCT TESTING OF THE HELIUM RECOVERY SYSTEM AT THE SIERRA LOBO TECHNOLOGY…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
NNX13CS01P
Contractor
Sub-agency / office
National Aeronautics and Space Administration
Award amount
$74,995
Period of performance
Apr 11, 2013 – Oct 10, 2013
NAICS
541712 — Research and Development in the Physical, Engineering, and Life Sciences
PSC
PSC AR11
Place of performance
OH

Public award description

IGF::OT::IGF SIERRA LOBO SHALL CONDUCT TESTING OF THE HELIUM RECOVERY SYSTEM AT THE SIERRA LOBO TECHNOLOGY DEVELOPMENT AND ENGINEERING CENTER IN MILAN, OHIO. TESTING SHALL INCLUDE SAMPLING OF THE PRODUCT STREAM TO DETERMINE HELIUM PURITY THROUGH THIRD-PARTY ANALYSIS OF THE SAMPLE.SIERRA LOBO SHALL DEVELOP A MODIFICATION TO THE HELIUM RECOVERY SYSTEM SOFTWARE TO PROVIDE A NEW CAPABILITY TO CALCULATE THE HYDROGEN CONTENT OF THE INCOMING HYDROGEN/HELIUM FLOW BASED ON SYSTEM MEASUREMENTS.SIERRA LOBO SHALL TEST THE NEW CAPABILITY OF THE HELIUM RECOVERY SYSTEM TO CALCULATE THE HYDROGEN CONTENT OF THE INCOMING HYDROGEN/HELIUM FLOW MIXTURE.SIERRA LOBO SHALL DESIGN A NEW HELIUM RECOVERY SYSTEM LOW-PRESSURE VENT ACCESSORY FOR THE HELIUM RECOVERY SYSTEM. THE LOW-PRESSURE VENT ACCESSORY SHALL CONSIST OF A 30 PSID COMPRESSOR, RESERVOIR, AND MANIFOLD. THE LOW-PRESSURE VENT ACCESSORY PROVIDES THE CAPABILITY TO OPERATE THE HELIUM RECOVERY SYSTEM CONNECTED DIRECTLY TO A HYDROGEN VENT SYSTEM, ENABLING A NEW CONCEPT OF OPERATIONS FOR PURGING HYDROGEN VENT SYSTEMS WITH THE ABSOLUTE MINIMUM AMOUNT OF HELIUM.SIERRA LOBO SHALL PROVIDE IN ACCORDANCE WITH SIERRA LOBO ISO/AS9100/CMMI QUALITY PROCESSES, OVERALL ADMINISTRATIVE AND PROGRAM MANAGEMENT OF THE PROJECT AND SHALL INCLUDE CONTRACT ADMINISTRATION, FINANCIAL PLANNING, AND ACCOUNTING, PREPARATION AND UPDATE PROJECT SCHEDULES, UPDATE WORK PLANS, MAINTAIN QUALITY ASSURANCE, AND PREPARE CUSTOMER DELIVERABLES.SIERRA LOBO SHALL CONDUCT SYSTEMS ENGINEERING TASKS AS REQUIRED IN ACCORDANCE WITH SIERRA LOBO ISO/AS9100/CMMI QUALITY PROCESSES THAT MAY INCLUDE; REQUIREMENTS MANAGEMENT, DEVELOPMENT OF CONTROLLED DOCUMENTATION FOR DESIGN, FABRICATION, AND TEST, DEVELOPMENT OF HAZARDS ANALYSES, AND PREPARE FOR AND CONDUCT PRELIMINARY DESIGN REVIEWS, CRITICAL DESIGN REVIEWS, AND TEST READINESS REVIEWS.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.