Federal Awards · Award

IGF::OT::IGF CLOSED WIND TUNNEL BEAMFORMING FOR AEROACOUSTICS HAS BECOME MORE AND MORE PREVALENT IN RECENT…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
NNX14CC33P
Contractor
Sub-agency / office
National Aeronautics and Space Administration
Award amount
$0
Period of performance
Jun 20, 2014 – Dec 19, 2014
NAICS
541712 — Research and Development in the Physical, Engineering, and Life Sciences
PSC
PSC AR11
Place of performance
WA

Public award description

IGF::OT::IGF CLOSED WIND TUNNEL BEAMFORMING FOR AEROACOUSTICS HAS BECOME MORE AND MORE PREVALENT IN RECENT YEARS. STILL, THERE ARE MAJOR DRAWBACKS AS CURRENT MICROPHONE ARRAYS ARE RATHER LARGER AND HARD TO INSTALL AND CONVENTIONAL BEAMFORMING AND DECONVOLUTION TECHNIQUES DO NOT WORK WELL IN LOW SIGNAL-TO-NOISE ENVIRONMENTS. OUTLINED IN THE PROPOSAL IS A PHASED AIRFOIL IMAGING MICROPHONE ARRAY LOCATED INSIDE THE WIND TUNNEL WHICH UTILIZES FUNCTIONAL BEAMFORMING, A MODIFICATION OF CONVENTIONAL BEAMFORMING. A COMPLETED UNIT WOULD BE COMPRISED OF SEVERAL AIRFOILS WITH MICROPHONES PLACED IN A LINEAR FASHION ALONG THE LEADING EDGES. FUNCTIONAL BEAMFORMING IS A BREAKTHROUGH ALGORITHM THAT WILL ALLOW FOR MUCH BETTER BEAMFORM MAPPING WITH MUCH SMALLER ARRAYS THAN WHAT IS CURRENTLY AVAILABLE. BECAUSE OF THE POTENTIAL SMALL SIZE OF THE ARRAY, IT WOULD BE EASY TO INSTALL AND IMPLEMENT. PLACING THE ARRAY IN THE TUNNEL ALSO ALLOWS FOR NUMEROUS VIEWING ANGLES OF THE TEST MODELS AS OPPOSED TO A SINGLE VIEW PROVIDED BY WALL ARRAYS. PHASE I WILL FOCUS ON DESIGNING, BUILDING, AND TESTING THE MULTI-ARM AIRFOIL ARRAY TO TROUBLESHOOT OPERATION AND ELIMINATE SHOWSTOPPERS. FUNCTIONAL BEAMFORMING SOFTWARE IS CURRENTLY AVAILABLE AND DOES NOT REQUIRE FURTHER DEVELOPMENT THE RIGHTS OF WHICH ARE OWNED BY OPTINAV, INC. THE PI HAS A PLETHORA OF EXPERIENCE AND KNOWLEDGE IN ACOUSTICAL TESTING AND PHASED IMAGING ARRAYS AND WAS A KEY INVESTIGATOR IN EARLY CLOSED WIND TUNNEL ACOUSTICAL TESTING. THE PROPOSAL OUTLINES A WORK PLAN WHICH INCLUDES TESTING IN THE KIRSTEN WIND TUNNEL AT THE UNIVERSITY OF WASHINGTON WHICH HAS ALREADY AGREED TO SUPPORT THE TESTS.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.