IGF::OT::IGF THE OVERALL TECHNICAL OBJECTIVE OF THIS MULTI-PHASE PROJECT IS TO DEVELOP AND VALIDATE A SO-CA…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- NNX14CL02C
- Contractor
- Awarding agency
- National Aeronautics and Space Administration
- Sub-agency / office
- National Aeronautics and Space Administration
- Award amount
- $749,997
- Period of performance
- Jun 30, 2014 – Jun 29, 2016
- NAICS
- 541712 — Research and Development in the Physical, Engineering, and Life Sciences
- PSC
- PSC AR11
- Place of performance
- AZ
Public award description
IGF::OT::IGF THE OVERALL TECHNICAL OBJECTIVE OF THIS MULTI-PHASE PROJECT IS TO DEVELOP AND VALIDATE A SO-CALLED 'AAW-PROCESS' THAT CONSISTS OF (I) THE ACTIVE AEROELASTIC WING (AAW) TECHNOLOGY OF EMPLOYING MULTIPLE CONTROL SURFACES IN TANDEM FOR ACHIEVING LOADS ALLEVIATION AND DRAG MINIMIZATION USING THE OVER-DETERMINED TRIM CAPABILITY OF ZONA EULER UNSTEADY SOLVER (ZEUS), AND (II) THE AEROELASTIC TAILORING TECHNIQUE FOR OPTIMUM STIFFNESS DISTRIBUTION AND WEIGHT MINIMIZATION WHILE SATISFYING STRUCTURAL DESIGN CONSTRAINTS USING ZONA'S AUTOMATED STRUCTURAL OPTIMIZATION SYSTEM (ASTROS). THE TECHNICAL OBJECTIVES SPECIFIC TO PHASE II EFFORT ARE TWOFOLD: (1) ANALYTICALLY DESIGN THE FOUR SUBSONIC ULTRA GREEN AIRCRAFT RESEARCH (SUGAR) WIND-TUNNEL MODELS THAT EMPLOY DISTRIBUTED MULTIPLE CONTROL SURFACES (DMCS) AND VARIABLE CAMBER CONTINUOUS TRAILING EDGE FLAP (VCCTEF) TO ACHIEVE THE WEIGHT AND DRAG BENEFITS, AND (2) FABRICATION OF ONE OF THESE FOUR DESIGNED MODELS TO VALIDATE THE AAW-PROCESS EXPERIMENTALLY BY A FUTURE WIND TUNNEL TESTING. AS PER THE FIRST SPECIFIC OBJECTIVE, FOUR WIND TUNNEL MODELS WILL BE DESIGNED FOR HIGH SPEED TRANSONIC DYNAMIC TUNNEL (TDT) TESTING ALONG WITH THEIR DETAILED FABRICATION AND WIND TUNNEL TESTING PLANS. THESE FOUR MODELS ARE CAREFULLY CHOSEN TO INCREMENTALLY DEMONSTRATE THE BENEFITS OF APPLYING AAW TECHNOLOGY AND AEROELASTIC TAILORING TECHNIQUE BY POTENTIAL FUTURE FABRICATION AND WIND TUNNEL TESTS. AS PER THE SECOND SPECIFIC OBJECTIVE, THE FABRICATED WIND TUNNEL MODEL WILL BE DELIVERED TO NASA ALONG WITH ITS TARGET PERFORMANCE IMPROVEMENT PREDICTED BY AAW-PROCESS FOR VALIDATION WITH A NEAR-TERM WIND TUNNEL TESTING. IN ORDER TO ENSURE THE SAFETY OF THE WIND TUNNEL MODELS DURING THE TDT TESTING, FLUTTER SUPPRESSION AND GUST LOAD ALLEVIATION CONTROLLERS WILL BE DESIGNED FOR THOSE MODELS THAT ARE NOT AEROELASTICALLY TAILORED AND HAVE ANALYTICALLY DISPLAYED POTENTIAL FLUTTER INSTABILITY PROBLEMS.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.