Federal Awards · Award

IGF::OT::IGF THE PHASE I PROJECT SUCCESSFULLY DEMONSTRATED THE FEASIBILITY OF DEVELOPING A TECHNOLOGY THAT…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
NNX14CM01C
Contractor
Sub-agency / office
National Aeronautics and Space Administration
Award amount
$0
Period of performance
Jun 30, 2014 – Apr 23, 2016
NAICS
541712 — Research and Development in the Physical, Engineering, and Life Sciences
PSC
PSC AR11
Place of performance
WA

Public award description

IGF::OT::IGF THE PHASE I PROJECT SUCCESSFULLY DEMONSTRATED THE FEASIBILITY OF DEVELOPING A TECHNOLOGY THAT WILL REDUCE COST AND MANUFACTURING TIME, BROADEN DESIGN OPTIONS, AND IMPROVE PERFORMANCE OF LARGE SPACE OPTICS. PRIMARILY ADDRESSED IS LIGHT WEIGHTING ULE GLASS MIRRORS FOR LARGE TELESCOPE SYSTEMS. WHILE MILLING AND CUTTING MATERIALS SUCH AS ULE OR SIC IS OFTEN PERFORMED AT ORMOND USING A NOVEL ABRASIVEJET TECHNOLOGY, THERE IS A NEED TO DEVELOP THIS TECHNOLOGY TO A THE REQUIREMENTS OF LARGE OPTICS MANUFACTURING. IN PHASE I, ORMOND PROPRIETARY GLASS AND CERAMIC CUTTING AND MILLING TECHNOLOGIES WERE ADAPTED TO AMTD-2 REQUIREMENTS THROUGH SOFTWARE, PROCESS AND TOOL DEVELOPMENT. THE TECHNOLOGY IS NOW AT TRL5 AND TECHNOLOGY FEASIBILITY HAS BEEN DEMONSTRATED. A DEMONSTRATION COUPON WAS MACHINED BASED ON THE CURRENT AMTD MIRROR CONCEPT AT RATES SEVERAL TIMES FASTER THAN CONVENTIONAL GRINDING CAN ACCOMPLISH. THIS DESIGN HAS 0.75 INCH DEEP HEX CELL POCKETS IN THE MIRROR BACK, THE SAME AS WOULD EXIST ON A FULL SCALE MIRROR. ROUGH SEMI-ELLIPTICAL OPTICAL SURFACE MACHINING WAS ALSO DEMONSTRATED IN SCHOTT GLASS. TOOLING DESIGNED IN THE PHASE II PROGRAM WILL SUPPORT SUBSTANTIAL IMPROVEMENTS IN RISK MITIGATION, TOLERANCE HOLDING CAPABILITY AND MATERIAL REMOVAL RATES. THIS WORK WILL CONTINUE TO BE PERFORMED WITH CLOSE INTERACTION WITH NASA AND EXELIS TO INSURE THAT THE WORK DIRECTLY SUPPORTS CURRENT AND FUTURE PROGRAM NEEDS. THE PHASE II PROGRAM WILL RESULT IN A WORKING SYSTEM THAT IS CAPABLE OF COMPLETING A 1/3 SCALE MODEL OF THE AMTD-2 MIRROR WITH TREMENDOUS COST SAVINGS, SCHEDULE REDUCTION AND RISK REDUCTION COMPARED TO GRINDING. CAPACITY FOR FULL SCALE UP WILL BE DEMONSTRATED DURING PHASE II.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.