IGF::OT::IGF PROVIDE NASA WITH ALL NECESSARY CABLING, INTERFACE EQUIREMENTS AND DOCUMENTATION, INCLUDING ME…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- NNX15CC04P
- Contractor
- Awarding agency
- National Aeronautics and Space Administration
- Sub-agency / office
- National Aeronautics and Space Administration
- Award amount
- $0
- Period of performance
- Apr 20, 2015 – Aug 30, 2015
- NAICS
- 541712 — Research and Development in the Physical, Engineering, and Life Sciences
- PSC
- PSC AR11
- Place of performance
- CA
Public award description
IGF::OT::IGF PROVIDE NASA WITH ALL NECESSARY CABLING, INTERFACE EQUIREMENTS AND DOCUMENTATION, INCLUDING MECHANICAL, ELECTRICAL, AND ENVIRONMENTAL REQUIREMENTS. THIS INCLUDES THE FOLLOWING ITEMS: A. BLOCK DIAGRAMS SHOWING ALL PDI AND HSI SYSTEMS COMPONENTS AND INTERCONNECTIONS B. DIMENSIONS, WEIGHTS AND MOUNTING SPECIFICATIONS OF EACH COMPONENT TO BE MOUNTED ON THE NASA PROVIDED X95 RAIL SYSTEM. C. LINE LENGTH LIMITATIONS FOR ALL NECESSARY PDI AND HSI SYSTEMS CABLING D. ENVIRONMENTAL REQUIREMENTS FOR EACH COMPONENT AND SYSTEM ENCLOSURE INCLUDING LIMITATIONS FOR AMBIENT CONDITIONS (PRESSURE, TEMPERATURE, MOISTURE, RF/ELECTRIC, ETC). COMPONENTS THAT REQUIRE SPECIFIC CLIMATE CONTROL SHALL BE DEFINED ALONG WITH THE REQUIRED CLIMATE CONDITIONS AND RANGES. E. AN ESTIMATED CABLE BUNDLE SIZE FOR ALL CABLING PENETRATING THE TEST CELL F. ELECTRICAL POWER REQUIREMENTS FOR THE PDI AND HSI SYSTEMS AND ALL NECESSARY SYSTEM COMPONENTS G. CALIBRATION SHEETS, SIGNAL LEVELS, SIGNAL CONDITIONING REQUIREMENTS AND FREQUENCY OF INTEREST FOR TRANSIENT/DYNAMIC SIGNALS. H. COME TO AN AGREEMENT WITH NASA REGARDING WHICH PARAMETERS FROM THE ARTIUM SUPPLIED INSTRUMENTATION SHALL BE RECORDED ON THE NASA DATA SYSTEM OF RECORD. I. ALL INFORMATION NECESSARY TO OBTAIN A LASER SAFETY PERMIT. J. SPACE REQUIREMENTS FOR ALL PDI AND HSI SYSTEMS COMPONENT SO NASA CAN PLAN TEST CELL LAYOUT, THE BASEMENT FLOOR PLAN, AND CONTROL ROOM LAYOUT. K. PROVIDED ALL REQUIRED CABLING FROM INSTRUMENTATION TO THE CONTROL ROOM BY APRIL 20, 2015 SO CABLING CAN BE INSTALLED BY NASA. L. UNLESS SPECIFIED DIFFERENTLY, ALL REQUIRED INFORMATION TO BE PROVIDED NOT LATER THAN APRIL 14, 2015.
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.