REMOVING THE EXISTING FLOOR TILE, INSTALL THE WATER PIPES (HOT WATER, COLD WATER AND DRAINS INSIDE THE WALL…
Award details are derived from public USAspending.gov records. Not a bid recommendation.
Award details
- Award ID
- SPO50008M0693
- Contractor
- Awarding agency
- Department of State
- Sub-agency / office
- Department of State
- Award amount
- $0
- Period of performance
- Aug 8, 2008 – Sep 30, 2008
- NAICS
- 236220 — Commercial and Institutional Building Construction
- PSC
- PSC Y111
Public award description
REMOVING THE EXISTING FLOOR TILE, INSTALL THE WATER PIPES (HOT WATER, COLD WATER AND DRAINS INSIDE THE WALL, INSTALL ELECTRICAL LINES FOR LIGHTS, WALL SOCKET AND EXHAUST FAN INSIDE THE WALLS. INSTALL NEW TILES ON THE WALLS AND ON THE FLOOR. SHALL INSTALL TWO SHOWER BASINS, TWO SHOWER FAUCETS AND HEADS, RELOCATE THE NEW TOILET BOWEL AND TANK, REMOVE AND DEACTIVATE THE URINAL, RELOCATE THE NEW WATER SINK, DRAIN AND FAUCETS, INSTALL A SUSPENDED CEILING OF GYPSUM BOARD, INSTALL NEW LIGHTS ON THE CEILING AND INSTALL PARTITIONS FOR THE SHOWERS AND TOIET AREA. PAINT THE CEILINGS AND PLASTERED WALLS WITH A WATER RESISTANT PAINT AND SAND AND PAINT BATHROOM DOOR. (SEE ATTACHED DRAWING FOR PLUMBING HARDWARE AND PARTITION RELOCATION)
Find out who's winning similar federal contracts
Discover comparable awards, related contractors, and agency purchasing history.