Federal Awards · Award

1) CONTRACTOR SHALL PROVIDE ALL REQUIRED MATERIALS AND LABOR TO APPLY SPRAY ON FIREPROOFING PAINT TO THE ST…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
VA620C00352
Contractor
Sub-agency / office
Department of Veterans Affairs
Award amount
$0
Period of performance
Feb 23, 2010 – Apr 23, 2010
NAICS
236220 — Commercial and Institutional Building Construction
PSC
PSC Y111
Place of performance
NY
Parent award
VA243C0706

Public award description

1) CONTRACTOR SHALL PROVIDE ALL REQUIRED MATERIALS AND LABOR TO APPLY SPRAY ON FIREPROOFING PAINT TO THE STEEL AREAS DESIGNATED IN 15 H BUILDING AT THE VA CASTLE POINT CAMPUS. 2) THE CONTRACTOR SHALL PROVIDE AND APPLY A FIREPROOFING MATERIAL THAT WILL PROVIDE A MINIMUM OF A TWO (2) HOUR RATING BASED ON UL DESIGN N759. 3) THE CONTRACTOR WILL ENSURE THAT A PROPER FIRE RATING IS ACHIEVED WHEN APPLYING THE FIREPROOFING TO THE CORRUGATED STEEL DECKING TO THE EXISTING WALLS. 4) THE VA WILL BE RESPONSIBLE FOR PREPARING WORK AREAS WITHIN ROOMS BY ENSURING ANY ITEMS THAT CAN BE MOVED OUT OF THE WAY ARE. IN THE EVENT THAT THE ITEMS CANNOT BE RELOCATED THE CONTRACTOR SHALL PROVIDE MEANS AND METHODS OF PROTECTING ITEMS FROM THE FIREPROOFING MATERIAL BEING APPLIED. 5) THE CONTRACTOR WILL ENSURE A SAFE AND CLEAN WORK SITE/ENVIRONMENT IS MAINTAINED DURING AND AT THE CONCLUSION OF WORK. 6) THE CONTRACTOR SHALL APPLY THE APPROXIMATELY LINEAR FEET OF FIREPROOFING IN THE ROOMS AS NOTED, WHICH MAY REQUIRE WORKING AROUND EXISTING DUCTWORK. A. H103 HVAC MECHANICAL ROOM 150 FT. B. H001 MECHANICAL ROOM 125 FT. C. H001A MECHANICAL ROOM 75 FT. D. H032 MECHANICAL ROOM 250 FT. APPROXIMATELY 3600 SQ FT. 7) THE CONTRACTOR SHALL APPLY APPROXIMATELY THE LINEAR FEET OF FIREPROOFING IN THE AREAS DOCUMENT WITHIN THIS SECTION IN CONJUNCTION WITH THE ATTACHED FLOOR PLAN. A. GROUND FLOOR SMOKE BARRIER 300 FT. B. GROUND FLOOR FIRE BARRIER 150 FT. C. FIRST FLOOR SMOKE BARRIER 170 FT. D. FIRST FLOOR FIRE BARRIER 150 FT. APPROXIMATELY 1,000 LINEAR FEET. 8) CONTRACTOR SHALL ENSURE THAT THE EQUIPMENT, PARTS AND MATERIALS BEING INSTALLED SHALL MEET UL, NFPA AND VA SPECIFICATIONS. SPECIFICATIONS ARE LISTED BELOW. 9) THE CONTRACTOR SHALL ALSO PROVIDE A THIRD PARTY INSPECTION OF THE FIREPROOFING AND PROVIDE A SATISFACTORY REPORT SHOWING PROPER INSTALLATION OF FIREPROOFING. 10) NOTE PORTIONS OF THIS WORK MAY REQUIRE WORKING DURING NON-NORMAL WORKING HOURS.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.