Federal Awards · DRS NETWORK & IMAGING SYSTEMS LLC · Award

THIS REQUIREMENT IS TO PROCURE THE LOT NINE (9) MINIMUM SUSTAINING RATE FOR THE MANUFACTURE, ASSEMBLE, TEST…

Award details are derived from public USAspending.gov records linked to this contractor. Not a bid recommendation.

Award details

Award ID
W909MY22C0023
Awarding agency
Department of Defense
Sub-agency / office
Department of the Army
Award amount
$62,642,314
Period of performance
Aug 23, 2022 – Jan 31, 2028
NAICS
334511 — Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
PSC
PSC 1240
Place of performance
MELBOURNE, FL, 329356715, USA
Competition
FULL AND OPEN COMPETITION · Set-aside: NO SET ASIDE USED. · 3 offers
Pricing
FIRM FIXED PRICE
Financial breakdown
Current value $62,642,314 · Obligated $62,642,314 · Potential value $101,385,796 · Latest action obligation $0

Public award description

THIS REQUIREMENT IS TO PROCURE THE LOT NINE (9) MINIMUM SUSTAINING RATE FOR THE MANUFACTURE, ASSEMBLE, TEST, AND DELIVERY IF A QUANTITY OF FORTY-EIGHT 3GEN FLIR DEWAR COOLER BENCHES IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT.

Most recent · Modification P00019 · Jun 12, 2026 · $0 action obligation · THIS REQUIREMENT IS TO PROCURE THE LOT NINE (9) MINIMUM SUSTAINING RATE FOR THE MANUFACTURE, ASSEMBLE, TEST, AND DELIVERY IF A QUANTITY OF FORTY-EIGHT 3GEN FLIR DEWAR COOLER BENCHES IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT. · W909MY22C0023

Modification P00018 · Apr 29, 2026 · $20,195,591 action obligation · THIS REQUIREMENT IS FOR THE PROCUREMENT OF LOW RATE INITIAL PRODUCTION OF THE 3RD GENERATION FORWARD LOOKING INFRARED DEWAR COOLER BENCHES. · W909MY22C0023

Modification P00017 · Nov 25, 2025 · $102,127 action obligation · THIS REQUIREMENT IS TO PROCURE THE LOT 9 MINIMUM SUSTAINING RATE FOR THE MANUFACTURE, ASSEMBLE, TEST, AND DELIVERY IF A QUANTITY OF FORTY-EIGHT THIRD GENERATION FORWARD LOOKING INFRARED DEWAR COOLER BENCHES IN ACCORDANCE WITH THE PWS. · W909MY22C0023

Modification P00016 · Sep 11, 2025 · $22,896,418 action obligation · THIS REQUIREMENT IS TO PROCURE THE LOT 9 MINIMUM SUSTAINING RATE FOR THE MANUFACTURE, ASSEMBLE, TEST, AND DELIVERY OF A QUANTITY OF FORTY-EIGHT 3GEN FLIR DEWAR COOLER BENCHES IN ACCORDANCE WITH 3.1.7.9 OF PERFORMANCE WORK STATEMENT. · W909MY22C0023

Modification P00015 · Jun 3, 2025 · $1,701,997 action obligation · THE PURPOSE OF THIS REQUIREMENT IS TO PROCURE LOW-RATE INITIAL PRODUCTION OF 3RD GENERATION FORWARD LOOKING INFRARED DEWAR COOLER BENCHES. · W909MY22C0023

Modification P00014 · Apr 17, 2025 · $0 action obligation · THE PURPOSE OF THIS REQUIREMENT IS TO PROCURE LOW-RATE INITIAL PRODUCTION OF 3RD GENERATION FORWARD LOOKING INFRARED DEWAR COOLER BENCHES. · W909MY22C0023

Modification P00013 · Mar 21, 2025 · $0 action obligation · THIS REQUIREMENT IS FOR THE PURCHASE OF LOW RATE INITIAL PRODUCTION OF 3RD GENERATION FORWARD LOOKING INFRARED DEWAR COOLER BENCHES. · W909MY22C0023

Modification P00012 · Feb 26, 2025 · $0 action obligation · THIS REQUIREMENT IS FOR THE PURCHASE OF LOW RATE INITIAL PRODUCTION OF 3RD GENERATION FORWARD LOOKING INFRARED DEWAR COOLER BENCHES. · W909MY22C0023

Modification P00011 · Dec 11, 2024 · $562,281 action obligation · THIS REQUIREMENT IS FOR THE PURCHASE OF LOW RATE INITIAL PRODUCTION OF 3RD GENERATION FORWARD LOOKING INFRARED DEWAR COOLER BENCHES. · W909MY22C0023

Modification P00010 · Nov 15, 2024 · $0 action obligation · THIRD GENERATION FORWARD LOOKING INFRARED (3GEN FLIR) LOW RATE INITIAL PRODUCTION (LRIP) DEWAR COOLER BENCH (DCB) PROGRAM. DCB PROVIDES THE ABILITY TO DETECT THREATS AT GREATER DISTANCES UNDER A FULL SPECTRUM OF CONFLICT AND BATTLEFIELD CONDITIONS. · W909MY22C0023

Modification P00009 · Sep 26, 2024 · $382,404 action obligation · THE THIRD GENERATION FORWARD LOOKING INFRARED LOW RATE INITIAL PRODUCTION DEWAR COOLER BENCH PROGRAM IS THE NEXT GENERATION OF RECONNAISSANCE, SURVEILLANCE AND TARGET ACQUISITION SIGHTS IMPROVING RANGE AND RESOLUTION FOR USE IN ARMY COMBAT VEHICLES. · W909MY22C0023

Modification P00008 · Jul 30, 2024 · $17,565 action obligation · INCREMENTAL FUNDING, REALIGN FUNDS, AND POP NO-COST EXTENSION · W909MY22C0023

Modification P00007 · May 9, 2024 · $0 action obligation · GFM TRANSFER AND CONSIDERATIONS · W909MY22C0023

Modification P00006 · Feb 21, 2024 · $0 action obligation · EXTENDING POPS FOR SLINS 0004AD, 0004AE, 0004AF, 0004AJ, 0004AK, ADD NSP CLIN 1008, AND INCORPORATE PBP INVOICING INSTRUCTIONS. · W909MY22C0023

Modification P00005 · Jan 17, 2024 · $307,505 action obligation · PROVIDING INC FUNDING FOR DCB REPAIRS AND YEAR 2 CDRLS, REALIGNING CEILING FROM 0007 TO 1007, 2007 & 3007, RECEIVING GFP TRANSFER. · W909MY22C0023

Modification P00004 · Aug 25, 2023 · $7,894,543 action obligation · FUNDING SERVICES, REVISE FACILITY CODE, REASSIGN PLACE OF PERFORMANCE, UPDATE ROUTING TABLE, INCORPORATE REVISED PWS, AND EXERCISE OPTION 1004. · W909MY22C0023

Modification P00003 · Mar 24, 2023 · $1,395,272 action obligation · THE PURPOSE OF MODIFICATION [P00003] IS TO EFFECT THE FOLLOWING: EXERCISE OPTION CLIN FOR ABRAMS LOT 2, INCORPORATE PBP INVOICING FOR CLIN 0003, FUNDING CLIN 0004 FOR VAM AND FAT PLANNING, REVISE TITLE FOR CLIN 0007, INCORPORATE REVISED PWS · W909MY22C0023

Modification P00002 · Jan 24, 2023 · $25,902 action obligation · THE PURPOSE OF MODIFICATION [P00002] IS TO INCORPORATE FOUR (4) ENGINEERING CHANGE PROPOSALS (ECPS) AND PROVIDE INCREMENTAL FUNDING UNDER CLIN 0004 FOR ECP IMPLEMENTATION. · W909MY22C0023

Modification P00001 · Nov 21, 2022 · $556,900 action obligation · MOD TO TRANSFER CEILING FROM CLIN 0004 TO CLIN 0007, OBLIGATE INCREMENTAL FUNDS FOR CLIN 0007 BASE PROCUREMENT CDRLS, INCORPORATE PBP INVOICING INSTRUCTIONS AND DFARS CLAUSE FOR CLINS 0001 AND 0007, AND REVISE CDRLS · W909MY22C0023

Modification 0 · Aug 23, 2022 · $6,603,808 action obligation · THE THIRD GENERATION FORWARD LOOKING INFRARED (3GEN FLIR) LRIP LOW RATE INITIAL PRODUCTION (LRIP) DEWAR COOLER BENCH (DCB) PROGRAM · W909MY22C0023

Source: USAspending.gov

Related intelligence

Related Federal Awards

  • Same contractor · W91CRB24F0253 — DELIVERY ORDER TO DRS NETWORK AND IMAGING FOR A QUANTITY OF 9,754 FWS-I SYSTEMS AGAINST CLIN 0005 · DRS NETWORK & IMAGING SYSTEMS LLC · Department of Defense · $117,138,300
  • Same contractor · HC108424F0067 — PU W/ GPS CAPABILITY READY · DRS NETWORK & IMAGING SYSTEMS LLC · Department of Defense · $115,010,984
  • Same contractor · W31P4Q18C0013 — AWARD FOR IMPROVED BRADLEY ACQUISITION SUBSYSTEM ENGINEERING SERVICES FOR A BASE YEAR IN FY18 AND OPTIONS I… · DRS NETWORK & IMAGING SYSTEMS LLC · Department of Defense · $97,278,955
  • Same contractor · W91CRB25FA250 — Federal award — Department of Defense · DRS NETWORK & IMAGING SYSTEMS LLC · Department of Defense · $63,814,400
  • Same contractor · W91CRB24F0247 — Federal award — Department of Defense · DRS NETWORK & IMAGING SYSTEMS LLC · Department of Defense · $52,503,137
  • Same contractor · W56HZV19F0073 — WORK DIRECTIVE (WD) FOR MAIN BATTLE TANK SYSTEMS (MBTS) TO PERFORM M1A1 EMBEDDED DIAGNOSTICS (ED) POST PROD… · DRS NETWORK & IMAGING SYSTEMS LLC · Department of Defense · $46,783,559

Browse federal awards · Browse contractors

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.