Federal Awards · Award

CONSTRUCTION OF PROJECTS NVZR062031 AND NVZR132003, 290TH JCSS, MACDILL AFB, TAMPA, FL. PROJECTS ARE SUSTAI…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
W911YN19C0002
Contractor
Awarding agency
Department of Defense
Sub-agency / office
Department of the Army
Award amount
$6,153,357
Period of performance
Mar 21, 2019 – Oct 31, 2020
NAICS
236220 — Commercial and Institutional Building Construction
Place of performance
FL

Public award description

CONSTRUCTION OF PROJECTS NVZR062031 AND NVZR132003, 290TH JCSS, MACDILL AFB, TAMPA, FL. PROJECTS ARE SUSTAINMENT, RESTORATION AND MODERNIZATION (SRM). PROJECT NVZR NVZR062031 REPAIR JCSS RESERVE FORCES BUILDING 1885 AND NVZR132003 REPAIR JCSS VEHICLE MAINTENANCE BUILDING 1886, LOCATED AT THE 290TH JCSS, MACDILL AFB, TAMPA, FL. PROJECT NVZR062031 WORK INCLUDES A PRECONSTRUCTION BUILDING SURVEY FOR ASBESTOS-CONTAINING MATERIALS; SELECTIVE DEMOLITION OF EXTERIOR WINDOWS AND SITE ELEMENTS, INTERIOR WALLS, FLOOR AND WALL FINISHES, DOORS, MILLWORK, FIXTURES, FURNISHINGS, EQUIPMENT, MECHANICAL SYSTEMS, ELECTRICAL SECONDARY SYSTEMS AND LIGHTING, AND FIRE SPRINKLER SYSTEMS. MODIFICATIONS TO EXISTING UNDERGROUND UTILITIES AND PAVEMENT REPLACEMENT. COMPLETE DEMOLITION OF EXISTING LOW SLOPED ROOFING ASSEMBLY AND RELATED ITEMS. CONSTRUCTION OF NEW DOUBLE PITCHED HIGH SLOPE METAL STANDING SEAM ROOF ON NEW PURLIN FRAMING SET ON THE EXISTING LOW SLOPE ROOF DECK, WITH GUTTERS, DOWNSPOUTS, ROOF HATCH AND OTHER ACCESSORIES. CONSTRUCTION OF NEW EXTERIOR STOREFRONT ASSEMBLIES AND WALL INFILL, NEW EXTERIOR PEDESTRIAN ACCESSIBLE RAMP AND RETAINING WALL. NEW INTERIOR WALLS, NEW DOORS, NEW INTERIOR WINDOWS, NEW OPERABLE WALL SYSTEM, NEW TOILET AND LOCKER ROOMS, NEW FLOOR AND WALL FINISHES; NEW MECHANICAL SYSTEMS; NEW INTERIOR PLUMBING SYSTEMS CONNECTED TO EXISTING SITE UTILITIES; NEW AREAS OF ELECTRICAL SECONDARY SYSTEMS, LIGHTING, AND EMERGENCY LIGHTING; NEW WET PIPE FIRE SPRINKLER SYSTEM; AND INCIDENTAL RELATED WORK. PROJECT NVZR132003 WORK INCLUDES A PRECONSTRUCTION BUILDING SURVEY FOR ASBESTOS-CONTAINING MATERIALS; SELECTIVE DEMOLITION OF PORTIONS OF INTERIOR WALLS, FLOOR AND WALL FINISHES, DOORS, MILLWORK, FIXTURES, FURNISHINGS, EQUIPMENT, MECHANICAL SYSTEMS, ELECTRICAL SECONDARY SYSTEMS, LIGHTING, AND DEVICES, AND FIRE SPRINKLER SYSTEMS. COMPLETE DEMOLITION OF EXISTING LOW SLOPED ROOFING ASSEMBLY AND RELATED ITEMS. CONSTRUCTION OF NEW DOUBLE PITCHED HIGH SLOPE METAL STANDING SEAM ROOF ON NEW PURLIN FRAMING SET ON THE EXISTING LOW SLOPE ROOF DECK, WITH GUTTERS, DOWNSPOUTS, ROOF HATCH AND OTHER ACCESSORIES. CONSTRUCTION OF NEW INTERIOR WALLS, NEW DOORS, NEW TOILET AND LOCKER ROOMS, NEW FLOOR AND WALL FINISHES. NEW MECHANICAL SYSTEMS; NEW INTERIOR PLUMBING SYSTEMS CONNECTED TO EXISTING SITE UTILITIES; NEW AREAS OF ELECTRICAL SECONDARY SYSTEMS, LIGHTING, EMERGENCY LIGHTING, AND DEVICES; NEW WET PIPE FIRE SPRINKLER SYSTEM; AND INCIDENTAL RELATED WORK.

Source: USAspending.gov

Find out who's winning similar federal contracts

Discover comparable awards, related contractors, and agency purchasing history.

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. Click Gemini to copy the research question when your browser allows, or use Copy question.