Federal Awards · GRANITE CONSTRUCTION COMPANY · Award

THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLO…

Award details are derived from public USAspending.gov records. Not a bid recommendation.

Award details

Award ID
W9123823C0014
Contractor
GRANITE CONSTRUCTION COMPANY
Awarding agency
Department of Defense
Sub-agency / office
Department of the Army
Funding agency
Corps of Engineers - Civil Works
Award amount
$178,566,675
Period of performance
Jun 1, 2023 – Dec 2, 2026
NAICS
237990 — Other Heavy and Civil Engineering Construction
Place of performance
WEST SACRAMENTO, CA, 956052710, USA
Competition
FULL AND OPEN COMPETITION · Set-aside: NO SET ASIDE USED. · 3 offers
Pricing
FIRM FIXED PRICE
Financial breakdown
Current value $206,765,191 · Obligated $204,110,193 · Potential value $206,765,191 · Latest action obligation $85,461 · Outlays $16,638,633

Public award description

THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.

Most recent · Modification A00031 · Jul 1, 2026 · $85,461 action obligation · ARCF SAC BYPASS WEIR WIDENING CLIN 0034/ MOD U00038, R00048/CD060 (VEQ- SOIL TYPE 2)(100% NONFED) (P2 NO. 456852) · W9123823C0014

Modification P00011 · Jun 12, 2026 · $7,000,000 action obligation · ARCF SAC BYPASS WEIR WIDENING CLIN 1047/ MOD R00047/CD054-1 (PT 1 WEIR STRUCTURAL BACKFILL)(100% NONFED) (P2 NO. 456852) · W9123823C0014

Modification PZ0010 · May 27, 2026 · $187,168 action obligation · ARCF SAC BYPASS WEIR WIDENING DEFINITIZE CHANGE ORDER CD 49 - ADDITIONAL INSTRUMENTATION · W9123823C0014

Modification A00030 · Apr 27, 2026 · $58,596 action obligation · ARCF SAC BYPASS WEIR WIDENING RAZOR WIRE AND AGG SURFACING · W9123823C0014

Modification A00029 · Apr 23, 2026 · $15,639 action obligation · ARCF SAC BYPASS WEIR WIDENING REA FOR DIFFERING SITE CONDITIONS ENCOUNTERED DURING EXCAVATION OF A FIBER OPTIC TRENCH · W9123823C0014

Modification P00009 · Apr 17, 2026 · $3,500,000 action obligation · UNDEFINITIZED CONTRACT ACTION TO CONSTRUCT NORTH ABUTMENT PER THE REVISED DRAWINGS AND SPECIFICATIONS PROVIDED. · W9123823C0014

Modification A00028 · Mar 12, 2026 · $150,863 action obligation · IN-PROGRESS QUANTITY INCREASE OF 26,263.29 CUBIC YARD FOR SOIL TYPE 1 IN-PROGRESS QUANTITY INCREASE OF 1,379.29 CUBIC YARD FOR SOIL TYPE 4 · W9123823C0014

Modification P00008 · Mar 6, 2026 · $1,578,701 action obligation · CD 41 / MOD REFERENCE R00040 REA BASED ON CHANGED VEHICLE BRIDGE PILE TIP ELEVATIONS FOR 51 PILES FROM AB1 THROUGH AB2 · W9123823C0014

Modification A00027 · Feb 24, 2026 · $-223 action obligation · CD 45-2 / R00037 THIS MODIFICATION DEFINITIZES PREVIOUSLY EXECUTED MODIFICATION REFERENCE R00031 - PROVIDE ALL NECESSARY ITEMS REQUIRED TO INSTALL/MONITOR TWO ZERO-ANNULUS DIRECT PUSH PIEZOMETERS AT SPECIFIC LOCATIONS. · W9123823C0014

Modification P00007 · Feb 6, 2026 · $4,000,000 action obligation · R00039 CD 40-1 AB 2 DEMOLISH EXISTING AB ABUTMENT 1. CONTRACTOR TO DEMOLISH ABUTMENT 2 TO THE EXTENTS, GRADES, AND LIMITS AS DESCRIBED IN REVISED DRAWING CD-105 AND PROCURE 173 ADDITIONAL PILES FABRICATED OF ASTM A252, GRADE 3, 60 KSI STEEL. · W9123823C0014

Modification A00026 · Feb 5, 2026 · $121,320 action obligation · CONTRACT NO. W9123823C0014 ARCF SACRAMENTO BYPASS WEIR WIDENING. R00038 CD050 - UTILITY CONFLICT IN FP (RFI 229). TOTAL CONTRACT PRICE INCREASED BY $121,319.75. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. · W9123823C0014

Modification A00025 · Jan 29, 2026 · $9,232 action obligation · CD 48 - GIRDER STORAGE COSTS REA STORAGE COSTS INCURRED FOR AN ADDITIONAL SEVEN MONTHS OF STORAGE FOR GIRDERS SUPPORTING SPANS C4 AND C5 · W9123823C0014

Modification A00024 · Nov 25, 2025 · $299,241 action obligation · CD 44 - CHANGES TO BULKHEAD GUARDRAIL CONFIGURATION CD 47 - GOV'T DIRECTED WORK TO INVESTIGATE, ADDRESS, AND/OR MONITOR THE SETTLEMENT OF THE NORTHERN WEIR ABUTMENT · W9123823C0014

Modification A00023 · Nov 17, 2025 · $53,685 action obligation · REA FOR ADDITIONAL COSTS TO OBTAIN NEW PERMIT COVERAGE AND TO MAINTAIN COMPLIANCE WITH THE PERMIT REQUIREMENTS FOR THE REMAINING DURATION OF THE CONTRACT. STATE WATER BOARD REQUIRES PERMIT COVERAGE UNDER THE 2022 CONSTRUCTION GENERAL PERMIT. · W9123823C0014

Modification A00022 · Nov 13, 2025 · $150,000 action obligation · WINTERIZING EFFORTS TO PREVENT EROSION OVER THE WINTER'S RAINY SEASON WHILE THE GOVERNMENT INVESTIGATES CONCERNS REGARDING THE WEIR STILLING BASIN AND ASSOCIATED SLAB SUBGRADE. · W9123823C0014

Modification P00006 · Nov 5, 2025 · $600,000 action obligation · ADDITIONAL INSTRUMENTATION AND SUBSURFACE INVESTIGATIONS ARE NECESSARY TO PROVIDE ADDITIONAL GEOTECHNICAL INFORMATION ABOUT CURRENT SUBSURFACE CONDITIONS IN ORDER TO HAVE SUFFICIENT INFORMATION FOR A REDESIGN OF THE NORTH ABUTMENT. · W9123823C0014

Modification A00021 · Sep 3, 2025 · $51,000 action obligation · CD 45-1 INSTALL 2 PUSH-IN PIEZOMETERS DATA FROM THE INSTALLATION OF THESE PUSH-IN PIEZOMETERS WILL SUPPORT AND INFLUENCE A COURSE OF ACTION DIRECTLY RELATED TO THE RESOLUTION OF THE NORTH ABUTMENT WINGWALL SETTLEMENT/REPLACEMENT CHANGE CD 40-1. · W9123823C0014

Modification A00020 · Sep 3, 2025 · $51,485 action obligation · DELETE FIBER OPTIC VAULT PER GOVERNMENT RESPONSE TO RFI 190 · W9123823C0014

Modification A00019 · Aug 19, 2025 · $243,565 action obligation · CD 34 - DESIGN CHANGES TO SOUTH ABUTMENT APPROACH · W9123823C0014

Modification A00018 · Aug 12, 2025 · $9,770 action obligation · CHANGE: CD038 TITLE: VEQ - CLIN 35 INTERIM QTY IN PROGRESS QUANTITIES FOR CLIN 35 CHANGE: CD043 TITLE: NOC 12 - PG&E SPLICE BOX REA REA FOR REDESIGN AND RE-FABRICATION REQUIRED TO COMPLY WITH DIRECTED CHANGES PER THE GOV'T RESPONSE TO RFI 179. · W9123823C0014

Modification A00017 · Jul 28, 2025 · $379,490 action obligation · VARIATION IN ESTIMATED QUANTITIES - CLIN 33 SOIL TYPE 1 · W9123823C0014

Modification P00005 · Jul 24, 2025 · $0 action obligation · SAC WEIR CONST - NON - FEDERAL FUNDING · W9123823C0014

Modification A00016 · Jul 8, 2025 · $196,563 action obligation · ADJUSTMENT TO FINAL ESTIMATED QUANTITIES TO CLIN 79 AND AN REA FOR WORK ON EXISTING STILLING BASIN · W9123823C0014

Modification A00015 · May 20, 2025 · $174,986 action obligation · PHASE 2 TOPO SURVEY REA REA FOR MULTIPLE PRE-CONSTRUCTION SURVEY VISITS RFI 158 - LIFT GATE ALIGNMENT CONFLICT IN SELECT DRAWINGS LEBLS ACCESS RD REPAIR REA REA FOR THE REPAIR AND MAINTENANCE OF THE LEBLS CONNECTION ROAD FOR DWR EMERGENCY ACCESS. · W9123823C0014

Modification A00014 · May 1, 2025 · $162,601 action obligation · CD 33 - REA FOR GATE STEM/GUIDE DESIGN REVISIONS CD 35 - REA FOR GROUNDBREAKING CEREMONY STANDDOWN · W9123823C0014

Source: USAspending.gov

Related intelligence

Related Federal Awards

  • Same agency and NAICS · W912EK26CA004 — BRANDON ROAD INTERBASIN PROJECT, INCREMENT 1-A CONSTRUCTION. MODIFICATION TO SET THE CONTRACT COMPLETION DA… · J. F. BRENNAN COMPANY, INC. · Department of Defense · $113,853,380
  • Same agency and NAICS · W912EK26CA016 — CEDAR RAPIDS FLOOD RISK MANAGEMENT PROJECT, REACH 4 PHASE 1 DOWNSTREAM RIVER FLOODWALL AND PUMP STATION. MO… · GENERAL CONSTRUCTORS INC. OF THE QUAD CITIES · Department of Defense · $39,752,096
  • Same agency and NAICS · W912HY26CA020 — THIS WORK CONSISTS OF MAINTENANCE DREDGING VIA PIPELINE DREDGE OF THE CORPUS CHRISTI SHIPPING CHANNEL (CCSC… · MIKE HOOKS, LLC · Department of Defense · $17,868,250
  • Same agency and NAICS · W912DR26CA013 — THE SCOPE OF WORK CONSISTS OF CONSTRUCTING A REINFORCED CONCRETE ROCK ANCHOR WALL ALONG THE RIGHT SIDE OF T… · ALLISON PARK CONTRACTORS, INC. · Department of Defense · $17,055,100
  • Same agency and NAICS · W912BU26CA026 — THE U.S. ARMY CORPS OF ENGINEERS (USACE), PHILADELPHIA DISTRICT (NAP), INTENDS TO AWARD THE CONTRACT FOR TH… · NORFOLK DREDGING COMPANY · Department of Defense · $15,762,975
  • Same agency and NAICS · W912EE26CA009 — LEASE OF ONE CUTTERHEAD, HYDRAULIC PIPELINE DREDGE (NOT LESS THAN 24-INCH DIAMETER), FULLY OPERATED WITH AT… · INLAND DREDGING COMPANY, L.L.C. · Department of Defense · $11,340,001

Browse federal awards · Browse contractors

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.