- Award ID
- W9126G19C0001
- Contractor
- CADDELL CONSTRUCTION CO. (DE), LLC
- Sub-agency / office
- Department of the Army
- Award amount
- $150,006,762
- Period of performance
- Mar 20, 2019 – Apr 24, 2023
- NAICS
- 236220 — Commercial and Institutional Building Construction
- PSC
- PSC Y1FC
- Place of performance
- LACKLAND AFB, TX, 782365324, USA
- Competition
- FULL AND OPEN COMPETITION · Set-aside: NO SET ASIDE USED. · 2 offers
- Pricing
- FIRM FIXED PRICE
- Financial breakdown
- Current value $303,328,305,276 · Obligated $150,436,281 · Potential value $303,328,305,276 · Latest action obligation $0 · Outlays $0
PROVIDE FOR A 1,248 PERSON AIRMEN TRAINING COMPLEX, DORMITORY AND A DINING/CLASSROOM FACILITY WITH SUPPORTING FACILITIES TO INCLUDE A FREE STANDING EQUIPMENT BUILDING TO HOUSE THE MECHANICAL EQUIPMENT, WEAPONS CLEANING PAVILION, RUNNING TRACK, EXERCISE PADS, PARKING LOTS, AT/FP LOW SECURITY WALL WITH INTEGRATED STREET LIGHTS AND LANDSCAPING/IRRIGATION.
Most recent · Modification P00020 · Jun 11, 2026 · $0 action obligation · ATC RECRUIT DORM #5 AND DCF #3 MJ102-2 UNFORESEEN AC PIPE OVER STORM LINE G · W9126G19C0001
Modification A00051 · Apr 17, 2026 · $22,133 action obligation · ATC RECRUIT DORM #5 AND DCF #3 R00070 MJ102-1 UNFORESEEN AC PIPE OVER STORM LINE G · W9126G19C0001
Modification P00019 · Mar 18, 2026 · $7,915 action obligation · ATC RECRUIT DORM #5 AND DCF #3 MJ102-1 UNFORESEEN AC PIPE OVER STORM LINE G · W9126G19C0001
Modification A00050 · Sep 29, 2025 · $-76,112 action obligation · MJ095 DESCOPE CIVIL WORK BY EISA POND, MJ096 DESCOPE EAGLE ROCK, MJ097 DESCOPE OF DCF 3 HAUL ROAD · W9126G19C0001
Modification P00018 · Aug 25, 2025 · $8,962 action obligation · CONSTRUCT ATC DORMITORY #5 COMPLEX MJ092 REVISED STORM G LINE, STORM F DESCOPE · W9126G19C0001
Modification A00049 · Apr 25, 2025 · $44,427 action obligation · MJ090 INSTALLATION OF VERTICAL DRAINS MJ091 ELEVATOR PIT LIGHTING MJ093 DCF3 DOORS 100C & 100D HARDWARE · W9126G19C0001
Modification P00017 · Aug 29, 2024 · $0 action obligation · MJ069 ATC5 LIGHT FIXTURES, MJ075 DCF3 ACCESS CONTROL DOOR HARDWARE, MJ084 LUKE BLVD ELEVATION CHANGE, MJ088 MODIFY COOLING TOWERS · W9126G19C0001
Modification A00048 · Mar 22, 2024 · $0 action obligation · MJ085 FEMOYER STREET WATER TIE IN · W9126G19C0001
Modification A00047 · Dec 1, 2023 · $147,999 action obligation · MJ076 COOLING TOWER CHEMICAL TREATMENT MJ078 RAISE EXISTING MANHOLE BY PED BRIDGE MJ081 LOADING DOCK RESTRAINT SYSTEM · W9126G19C0001
Modification P00016 · Nov 29, 2023 · $649,673 action obligation · MJ079 REA 13 AND REA 33 SOIL HAUL OFF TO COVEL GARDENS · W9126G19C0001
Modification A00046 · Sep 15, 2023 · $10,637 action obligation · MJ077 EB TR HARD CEILING · W9126G19C0001
Modification A00045 · Aug 25, 2023 · $11,281 action obligation · MJ071 REFRIGERANT LEAK DETECTOR · W9126G19C0001
Modification A00044 · Aug 15, 2023 · $15,302 action obligation · MJ072 DCF3 CHILLED WATER SUPPLY · W9126G19C0001
Modification A00043 · Aug 3, 2023 · $19,775 action obligation · MJ070 DCF3 ELEV EMERGENCY BATTERY, MJ074 ROOF LIFE SAFETY CABLE · W9126G19C0001
Modification A00042 · Jul 11, 2023 · $12,214 action obligation · MJ068 ADDITIONAL SPRAY FOAM DCF3 MECH ROOM 215 · W9126G19C0001
Modification A00041 · Apr 28, 2023 · $65,628 action obligation · MJ073 ADDITIONAL SOIL HAUL OFF TO COVEL GARDEN · W9126G19C0001
Modification A00040 · Dec 12, 2022 · $140,038 action obligation · MJ056 ATC 5 LEVEL 5 FIRE DAMPERS ADDITION · W9126G19C0001
Modification A00039 · Dec 7, 2022 · $60,301 action obligation · MJ060 PRESSURE REDUCING VALVE · W9126G19C0001
Modification A00038 · Nov 14, 2022 · $9,200 action obligation · MJ063 MISSING INTERDUCT · W9126G19C0001
Modification A00037 · Oct 7, 2022 · $9,635 action obligation · MJ055 DCF 3 NORTH FACADE LOUVER MJ058 DISCREPANCY DCF 3 MISSING LOUVER/OPENING · W9126G19C0001
Modification A00036 · Sep 27, 2022 · $0 action obligation · MJ061 DCF ELEVATION CHANGES AND ATC CHAIR RAIL HEIGHT · W9126G19C0001
Modification P00015 · Sep 7, 2022 · $296,801 action obligation · MJ045-2 REA FOR SOIL HAUL OFF TO COVEL GARDENS · W9126G19C0001
Modification A00035 · Aug 4, 2022 · $0 action obligation · MJ057 ROOF DRAIN ELEVATION CHANGES AT ATC MJ059 DCF 3 PAINT FINISH CORRECTIONS · W9126G19C0001
Modification A00034 · Jul 5, 2022 · $30,556 action obligation · MJ054 ATC 5 ADDED CMU AT CHASE WALLS · W9126G19C0001
Modification A00033 · May 24, 2022 · $54,138 action obligation · MJ052 ATC5 PIPE BRACING CONNECTIONS · W9126G19C0001