- Award ID
- W9126G22C0005
- Contractor
- SHIMMICK CONSTRUCTION COMPANY, INC.
- Sub-agency / office
- Department of the Army
- Funding agency
- Corps of Engineers - Civil Works
- Award amount
- $81,750,854
- Period of performance
- May 24, 2022 – Jan 14, 2026
- NAICS
- 237990 — Other Heavy and Civil Engineering Construction
- Place of performance
- LEWISVILLE, TX, 750676413, USA
- Competition
- FULL AND OPEN COMPETITION · Set-aside: NO SET ASIDE USED. · 3 offers
- Pricing
- FIRM FIXED PRICE
- Financial breakdown
- Current value $91,423,275 · Obligated $91,402,480 · Potential value $91,423,275 · Latest action obligation $-20,795 · Outlays $735,488
Most recent · Modification A00036 · Jun 18, 2026 · $-20,795 action obligation · BORROW PIT CREDIT · W9126G22C0005
Modification A00035 · Apr 23, 2026 · $0 action obligation · EAST SLIDE REPAIR · W9126G22C0005
Modification A00034 · Mar 19, 2026 · $172,632 action obligation · EAST SLIDE REPAIR · W9126G22C0005
Modification P00009 · Mar 17, 2026 · $1,892,997 action obligation · THIS MODIFICATION COMPENSATES THE CONTRACTOR FOR COST IN REA-0009 PART 3. SEE SUMMARY OF CHANGES. · W9126G22C0005
Modification P00008 · Mar 5, 2026 · $6,283,142 action obligation · THIS MODIFICATION COMPENSATES THE CONTRACTOR FOR COST IN REA-0009 PART 2. SEE SUMMARY OF CHANGES. · W9126G22C0005
Modification A00033 · Jan 22, 2026 · $13,650 action obligation · 11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS THE ABOVE NUMBERED SOLICITATION IS AMENDED AS SET FORTH IN ITEM 14. THE HOUR AND DATE SPECIFIED FOR RECEIPT OF OFFERS IS EXTENDED, IS NOT EXTENDED OFFERS MUST ACKNOWLEDGE RECEIPT OF THIS AMEN · W9126G22C0005
Modification A00032 · Oct 21, 2025 · $138,131 action obligation · REMOVE EMERGENCY BACKFILL PLACED IN TRENCHES IN JUNE 2024. · W9126G22C0005
Modification P00007 · Sep 11, 2025 · $0 action obligation · CONTRACT W9126G22C0005 WAS INITIALLY AWARDED WITH THE INCORRECT FAR CLAUSE 52.222-55. THIS MODIFICATION REPLACES THE ERRONEOUSLY INCLUDED CLAUSE WITH THE CORRECT FAR CLAUSE 52.222-55 TO ENSURE COMPLIANCE WITH CURRENT REGULATIONS. · W9126G22C0005
Modification P00006 · Sep 4, 2025 · $3,039,542 action obligation · THIS MODIFICATION PARTIALLY COMPENSATES THE CONTRACTOR FOR COSTS IN REA-0009, SPECIFICALLY ADDRESSING A DESIGN/SPECIFICATION DEFECT. THE ORIGINAL SPECIFICATION REQUIRED SHOTCRETING A 6-FOOT TRENCH WITHIN 6 HOURS OF EXCAVATION. · W9126G22C0005
Modification A00031 · Jul 16, 2025 · $66,912 action obligation · PAYS CONTRACTOR FOR ENGINEER AND DAM SAFETY SUBMITTAL NEEDED TO COMPLY WITH USACE POLICY. REDUCES PAYMENT FOR DRILLED PIERS DUE TO LOCATIONS BEING OUT-OF-TOLERANCE BUT STILL FUNCTIONAL. · W9126G22C0005
Modification P00005 · Jun 3, 2025 · $0 action obligation · THE PURPOSE OF THIS MODIFICATION IS TO IMPLEMENT EXECUTIVE ORDER 14173 AND 14148. · W9126G22C0005
Modification A00030 · May 16, 2025 · $12,900 action obligation · CONTRACTING OFFICER REQUIRED CONTRACTOR TO HEAT CONSTRUCTION JOINT CONCRETE TO 50 DEGREES. · W9126G22C0005
Modification A00029 · May 13, 2025 · $-74,190 action obligation · ADJUSTS RIP RAP QUANTITIES TO MATCH AMOUNT PLACED AND ADJUSTS PRICE. · W9126G22C0005
Modification A00028 · May 5, 2025 · $0 action obligation · EXTENDS CONTRACT COMPLETION BECAUSE OF WEATHER DELAYS · W9126G22C0005
Modification A00027 · May 1, 2025 · $5,841 action obligation · CHANGES ROUTE FOR DRAINAGE FROM BEHIND TRAINING WALL. · W9126G22C0005
Modification A00026 · Apr 30, 2025 · $30,148 action obligation · COMPENSATES CONTRACTOR FOR REVISING GRADING PLAN AT BORROW PIT DUE TO 2 DIFFERING SITE CONDITIONS · W9126G22C0005
Modification A00025 · Apr 1, 2025 · $9,808 action obligation · REMOVES PASSING PERMEABILITY TESTING AS REQUIREMENT FOR ACCEPTANCE ALLOWS KTR TO USE ADDITIONAL CONCRETE TO MAKE UP FOR UNEVEN SUBGRADE REPLACES 6" PIPE WITH 4" PIPE DUE TO UNEVEN SUBGRADE. · W9126G22C0005
Modification A00024 · Mar 24, 2025 · $26,207 action obligation · ADDITIONAL WORK REQUIRED TO DEMO CONCRETE IN TRENCH WHICH WAS NOT IDENTIFIED IN THE PLANS · W9126G22C0005
Modification A00023 · Jan 2, 2025 · $86,787 action obligation · REMOVAL OF CONCRETE PLACED IN TRENCHES AS EMERGENCY BACKFILL DUE TO HIGH WATER · W9126G22C0005
Modification A00022 · Nov 14, 2024 · $330,653 action obligation · PILE ORIENTATION SURVEY · W9126G22C0005
Modification A00021 · Nov 4, 2024 · $37,740 action obligation · EXTRA GRAVITY BLOCK CONCRETE PLACED TO HOLD SAND LAYER THAT WAS THICKER THAN SHOWN IN BORINGS. · W9126G22C0005
Modification A00020 · Oct 23, 2024 · $209,713 action obligation · PROVIDES ANCHORS TO SUPPORT SHOTCRETE IN A TRENCH · W9126G22C0005
Modification P00004 · Sep 20, 2024 · $523,013 action obligation · APRON OVERLAY · W9126G22C0005
Modification A00018 · Sep 16, 2024 · $11,417 action obligation · APRON OVERLAY · W9126G22C0005
Modification A00017 · Aug 23, 2024 · $353,556 action obligation · APRON OVERLAY · W9126G22C0005